Petroleum and Natural Gas Royalty and Freehold Production Tax Regulation, B.C. Reg. 495/92

Section 4

Royalty and tax payment

Cite as Petroleum and Natural Gas Royalty and Freehold Production Tax Regulation, B.C. Reg. 495/92, s. 4 · last amended September 1, 2024 · read from BC Laws on November 17, 2026

The text

(0.1) In this section: “greenhouse gas” has the same meaning as in section 1 of the Greenhouse Gas Reduction Targets Act; “pipeline company” means a person who owns, constructs or operates a pipeline. (1) A person to whom Crown invoices are issued must, by the end of the calendar month in which the Crown invoices are issued, pay to the government the total of the invoiced amounts in one of the following manners: (a) by an electronic method specified by the collector; (b) by a money order or cheque mailed to the government at an address specified by the collector. (2) A payment of an amount to the government under subsection (1) is deemed not to be paid to the government until, (a) if the payment is made directly to the government by an electronic method, the day of receipt by the government, (b) if the payment is made to a savings institution by an electronic method, the day recorded as the day of receipt by the savings institution, or (c) if the payment is mailed to the government, the day of receipt by the government. (2.1) Repealed. [B.C. Reg. 194/2018, Sch. 1, s. 2 (a).] (2.2) Repealed. [B.C. Reg. 191/2005, Sch. 2, s. 1.] (2.3) Repealed. [B.C. Reg. 194/2018, Sch. 1, s. 2 (a).] (3) A producer may deduct an overpayment in accordance with section 9 (7). (4) In addition to any deduction allowed under subsection (3), a producer may deduct a summer drilling deduction amount determined under subsection (5) in respect of a well if (a) the producer has an interest in the well at the time the well is completed, and (b) the well has a spud date after June 30, 2003 and before December 1, 2003, or, in any subsequent year up to 2012, after March 31 of that year and before December 1 of that year, (c) the same drilling rig drills the well from the spud date of the well until the well reaches its final total measured depth, or if, in the opinion of the collector, the same drilling rig is incapable of drilling the well for the whole of that period due to damage, 2 or more drilling rigs drill the well from the spud date of the well until the well reaches its final total measured depth, (c.1) the well does not have a completion in a zone that is within a net profit royalty project, and (d) the producer files a report for the summer drilling credit in accordance with section 8 (1) (r). (5) The summer drilling deduction amount is, for each well referred to in subsection (4), the producer's proportionate interest in the well multiplied by the lesser of the following: (a) 10% of the goods and service costs attributable to the well; (b) $100 000. (6) In addition to any deductions allowed under subsections (3) and (4), a producer may deduct (a) an infrastructure charge deduction amount if and to the extent that that deduction amount is available to the producer under subsections (7) and (8), and (b) a project deduction amount if and to the extent that that deduction amount is available to the producer under subsections (10) and (13). (7) Subsection (8) applies to a producer if (a) the producer enters into an agreement with the minister or the BC Transportation Financing Authority under which the producer agrees, for the purpose of providing cost recovery for the use of bridges, roads, rails, trails, utilities or other structures or works, to pay specified charges for specified activities in a specified area, (b) the producer is obliged to pay charges or tolls established for the purpose referred to in paragraph (a) under Part 3 of the Transportation Act, or (c) the producer is obliged to pay tolls prescribed for the purpose referred to in paragraph (a) under the Ministry of Energy and Mines Act. (8) The infrastructure charge deduction amount available to a producer referred to in subsection (7) is 50% of so many of the charges and tolls referred to in that subsection as the administrator is satisfied (a) represent cost recovery for the use of bridges, roads, rails, trails, utilities or other structures or works, and (b) have been paid by the producer. (9) For the purposes of subsection (10), a producer may notify the administrator, in writing, that the producer intends to undertake a project to (a) construct or upgrade pipelines, bridges, roads, rails or trails in British Columbia in support of petroleum or natural gas exploration or development in British Columbia, or (b) do one or more of the following in respect of an oil and gas or storage activity in British Columbia: (i) avoid, reduce or sequester greenhouse gas emissions; (ii) avoid or reduce an adverse effect on water quality or quantity or the timing of water flow; (iii) avoid or reduce an adverse effect on the environment. (9.1)-(9.2) Repealed. [B.C. Reg. 192/2016, s. 1 (c).] (10) If the administrator receives a notice under subsection (9), the administrator may enter into an agreement with the producer that (a) entitles the producer to deduct, from the royalty or tax otherwise payable by the producer under the Act, a portion of the costs attributable to that project in the form of a project deduction amount determined in accordance with subsections (11) and (15), (b) for the purposes of paragraph (a), identifies the steps that constitute the project and specifies (i) what constitutes the completion of each step of the project, (ii) the estimated completion cost of each step of the project, and (iii) the estimated completion cost of the project, and (c) for the purposes of paragraph (a), specifies the circumstances that must exist or the conditions that must be met before the project deduction amount, or a portion of a project deduction amount, may be deducted. (11) Subject to subsection (15), the project deduction amount available, for each of the specified steps of a project, to a producer who has entered into an agreement for that project under subsection (10) is up to 50% of the lesser of the estimated completion cost of that step and the amount spent by the producer to complete that step, if the administrator is satisfied that (a) the step has been completed in the manner and to the extent required by the agreement, (b) the producer intends to complete the project, (c) the completion cost for which the deduction amount is calculated has been paid by the producer, and (d) the circumstances or conditions referred to in subsection (10) (c) exist or have been met. (12) For the purposes of subsection (13), a pipeline company may notify the administrator, in writing, that the pipeline company intends to undertake a project, in a contractual arrangement with one or more producers, to (a) construct or upgrade pipelines in British Columbia in support of petroleum or natural gas exploration or development in British Columbia, or (b) do one or more of the following in respect of an oil and gas or storage activity in British Columbia: (i) avoid, reduce or sequester greenhouse gas emissions; (ii) avoid or reduce an adverse effect on water quality or quantity or the timing of water flow; (iii) avoid or reduce an adverse effect on the environment. (13) If the administrator receives a notice under subsection (12), the administrator may enter into an agreement with the parties to the contractual arrangement that (a) entitles the producer or producers to deduct, from the royalty or tax otherwise payable by the producer or producers under the Act, a portion of the costs attributable to that project in the form of a project deduction amount determined in accordance with subsections (14) and (15), (b) for the purposes of paragraph (a), identifies the steps that constitute the project and specifies (i) what constitutes the completion of each step of the project, (ii) the estimated completion cost of each step of the project, and (iii) the estimated completion cost of the project, and (c) for the purposes of paragraph (a), specifies the circumstances that must exist or the conditions that must be met before the project deduction amount, or a portion of a project deduction amount, may be deducted. (14) Subject to subsection (15), the project deduction amount available, for each of the specified steps of the project, to producer or producers who have entered into an agreement for that project under subsection (13), is up to 50% of the lesser of the estimated completion cost of that step and the amount spent by the parties to the contractual arrangement to complete that step, if the administrator is satisfied that (a) the step has been completed in the manner and to the extent required by the agreement, (b) the parties to the contractual arrangement intend to complete the project, (c) the completion cost for which the deduction amount is calculated has been paid by the parties to the contractual arrangement, and (d) the circumstances or conditions referred to in subsection (13) (c) exist or have been met. (15) The total amount of project deduction amounts that may be deducted from the amount of royalty or tax otherwise payable by a producer under the Act must not exceed 50% of the lesser of (a) the estimated completion cost of the project, and (b) the amount spent by the producer or the parties to the contractual arrangement, as the case may be, to complete the project. (16) For the purposes of subsection (11) (d) or (14) (d), as applicable, the administrator may take any steps that are, in the opinion of the administrator, necessary to determine that the circumstances or conditions referred to in those subsections exist or have been met, as the case may be.
Read the Petroleum and Natural Gas Royalty and Freehold Production Tax Regulation on BC Laws ↗

Made under Petroleum and Natural Gas Act, RSBC 1996, c. 361.