Processing Facility Regulation, B.C. Reg. 48/2021
Schedule 1
Schedule 1
Cite as Processing Facility Regulation, B.C. Reg. 48/2021, Schedule 1 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
Schedule 1
[am. B.C. Reg. 181/2022, App. 4, s. 2.]
(section 7 (4)) 1 In this Schedule:
“boundary” means the boundary at which access to the processing facility is controlled, as identified in a security management program prepared and maintained under the Security Management Regulation;
“critical area” means an unshielded area of critical importance from which it is difficult or dangerous to evacuate people on short notice;
“remote area” means an area where people are, generally, present infrequently and in small numbers;
“sterile area” means an area in which there is no vegetation growth or combustible materials. 2 For the purposes of determining the allowable thermal radiation flux,
(a) solar radiation must be excluded,
(b) the normal flow rate is the flow rate that results from all operating modes within the processing facility design intent, and
(c) the accidental flow rate is the highest flow rate that
(i) results from an uncontrolled or unplanned event, and
(ii) is the sum of the combined flow rates from all possible uncontrolled or unplanned scenarios that may occur simultaneously. Allowable Thermal Radiation Flux Inside the Boundary Column 1
Location Inside Boundary Column 2
Maximum Thermal Radiation Flux (kW/m2) Normal Flow Rate Accidental Flow Rate Within the sterile area 5 9 Outer edges of the sterile area N/A 5 Roads and open areas 3 5 Storage tanks and process equipment 1.5 5 Control rooms, maintenance workshops, laboratories, warehouses and other occupied structures within the processing facility 1.5 5 Allowable Thermal Radiation Flux Outside the Boundary Column 1
Location Outside Boundary Column 2
Maximum Thermal Radiation Flux (kW/m2) Normal Flow Rate Accidental Flow Rate Remote area 3 5 Critical area 1.5 1.5 Other areas 1.5 3
Read the Processing Facility Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.