Processing Facility Regulation, B.C. Reg. 48/2021

Section 25

Construction and post-construction records

Cite as Processing Facility Regulation, B.C. Reg. 48/2021, s. 25 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

A processing facility permit holder must keep construction and post-construction records as follows: (a) records demonstrating compliance with sections 6 [development of management system], 7 [engineering design and siting] and 8 [storage system]; (b) verification reports made for the purposes of section 12 [modular units]; (c) records of results referred to in section 14 (1) [pre-operation testing]; (d) record drawings referred to in section 17 [record drawings].
Read the Processing Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.