Processing Facility Regulation, B.C. Reg. 48/2021

Section 18

General requirements respecting operation

Cite as Processing Facility Regulation, B.C. Reg. 48/2021, s. 18 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

(1) A processing facility permit holder must operate the processing facility in accordance with (a) the engineering design, (b) the codes and standards, and (c) the management system. (2) A processing facility permit holder must maintain a control room for the safe and efficient operation of the processing facility and for emergency situations. (3) A processing facility permit holder must ensure that (a) the signs required under section 15 [signs] remain posted throughout the operation of the processing facility, (b) the processing facility is maintained in a condition that minimizes hazards, including hazards associated with pits, holes, equipment and storage of materials, and (c) the facility site is clean and free of garbage, debris and derelict equipment. (4) A processing facility permit holder must ensure that normal operations at the processing facility do not cause excessive noise or light. (5) A processing facility permit holder must ensure that a warning symbol in Schedule 2 is not posted in any place where there is no hazard.
Read the Processing Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.