Strata Property Regulation, B.C. Reg. 43/2000
Section 5.9
Deadlines and exemptions for strata corporations with phased strata plan
Cite as Strata Property Regulation, B.C. Reg. 43/2000, s. 5.9 · last amended May 11, 2026 · read from BC Laws on November 17, 2026
The text
(1) This section does not apply to a strata corporation unless the strata plan is a phased strata plan.
(2) For the purposes of section 94.1 (2) of the Act, an existing strata corporation must obtain an electrical planning report on or before each of the following dates:
(a) if the phases of the phased strata plan that are deposited as of December 31, 2023 include at least one phase with 5 or more strata lots, the following dates:
(i) if the land in the deposited phases is located wholly or partly in a specified area, December 31, 2026;
(ii) if the land in the deposited phases is located wholly outside of a specified area, December 31, 2028;
(b) each time a phase of the phased strata plan is deposited after December 31, 2023 and the number of strata lots in the phase is 5 or more, the date that is 5 years after the date of deposit of the phase.
(3) For the purposes of section 94.1 (2) of the Act, a new strata corporation must, each time a phase of the phased strata plan is deposited and the number of strata lots in the phase is 5 or more, obtain an electrical planning report on or before the date that is 5 years after the date of deposit of the phase.
(4) If the number of strata lots in each phase of the phased strata plan is fewer than 5, a strata corporation may defer obtaining an electrical planning report until the date that is 5 years after the date of deposit of the final phase.
Read the Strata Property Regulation on BC Laws ↗
Made under Strata Property Act, SBC 1998, c. 43.