Strata Property Regulation, B.C. Reg. 43/2000

Section 5.4

Timing of request

Cite as Strata Property Regulation, B.C. Reg. 43/2000, s. 5.4 · last amended May 11, 2026 · read from BC Laws on November 17, 2026

The text

For the purposes of section 90.1 (2) (b) of the Act, the date on or after which an owner must make a request under section 90.1 (1) of the Act is as follows: (a) if the strata corporation is required to obtain an electrical planning report referred to in section 94.1 of the Act, the earlier of the following dates: (i) the date on which the strata corporation obtains an electrical planning report for the first time; (ii) the date on or before which the strata corporation is required to obtain an electrical planning report for the first time; (b) if the strata corporation need not obtain an electrical planning report referred to in section 94.1 of the Act, December 31, 2026.
Read the Strata Property Regulation on BC Laws ↗

Made under Strata Property Act, SBC 1998, c. 43.