Dam Safety Regulation, B.C. Reg. 40/2016

Section 9

Dam emergency plan

Cite as Dam Safety Regulation, B.C. Reg. 40/2016, s. 9 · last amended February 10, 2023 · read from BC Laws on November 17, 2026

The text

(1) An owner of a dam for which there is not already an emergency plan and that has a classification of significant, high, very high or extreme must (a) prepare a plan, in the form and with the content specified by the comptroller or a water manager, that includes (i) a record describing the actions to be taken by the owner if there is an emergency at the dam, and (ii) a record containing information for the use of the local emergency authorities for the dam for the purpose of preparing local emergency plans under the Emergency Program Act, and (b) submit the plan to a dam safety officer for acceptance by the dam safety officer. (2) Subject to subsection (3), an owner of a newly constructed dam must comply with subsection (1) as soon as practicable and, in any event, no later than 60 days, after completion of the construction of the dam. (3) The comptroller or a water manager may order an owner of a dam to comply with subsection (1) on or before a specified date. (4) A record described in subsection (1) (a) (i) must include contact information for the persons and the government agencies and other organizations that are to be contacted by the owner of the dam if there is an emergency at the dam. (5) A record described in subsection (1) (a) (ii) must include the name and contact information of the person who is the emergency contact for the dam. (6) An owner of a dam must, promptly after a plan prepared for the dam under subsection (1) is accepted by a dam safety officer, deliver a copy of the record described in subsection (1) (a) (ii) to each local emergency authority for the dam. (7) An owner of a dam for which there is an emergency plan must, no less frequently than is specified in item 6 of the table in Schedule 2 for the classification of the dam, (a) review and, if necessary, revise the names and contact information in the records described in subsections (4) and (5) of this section, and (b) submit to a dam safety officer, for acceptance by the dam safety officer, (i) a record setting out the revisions, if any, or (ii) a written report advising that no revisions are necessary. (8) Subject to subsection (7), an owner of a dam for which there is an emergency plan must, no less frequently than is specified in item 8 of the table in Schedule 2 for the classification of the dam, (a) review and, if necessary, revise the emergency plan, and (b) if the record is revised, submit the revised record to a dam safety officer for acceptance by the dam safety officer. (9) Despite subsection (8), if the classification of a dam for which there is an emergency plan changes to a classification that is more severe in consequence, an owner of the dam must comply with subsection (8) (a) and (b) as soon as practicable after the owner becomes aware of the change of classification or on or before a later date specified by a dam safety officer. (10) If a record described in subsection (1) (a) (ii) for a dam is revised under this regulation, an owner of the dam must, promptly after the revision is accepted by a dam safety officer, deliver a copy of the revised record to each local emergency authority for the dam.
Read the Dam Safety Regulation on BC Laws ↗

Made under Water Sustainability Act, SBC 2014, c. 15.