Dam Safety Regulation, B.C. Reg. 40/2016

Section 16

Invasive investigations

Cite as Dam Safety Regulation, B.C. Reg. 40/2016, s. 16 · last amended February 10, 2023 · read from BC Laws on November 17, 2026

The text

(1) In this section, “invasive investigation” means an investigation that involves drilling, trenching, excavating a test pit or performing another invasive activity within or in close proximity to a dam. (2) An owner of a dam who intends to conduct an invasive investigation must, (a) at least 60 days before the date on which the owner expects the invasive investigation to begin, give to a dam safety officer written notice of the proposed investigation, and (b) at least 30 days before the date on which the owner expects the invasive investigation to begin (i) prepare a plan, in the form and with the content specified by a dam safety officer, in relation to the invasive investigation, and (ii) submit the plan to a dam safety officer for acceptance by the dam safety officer. (3) An owner of a dam must not begin an invasive investigation until a plan referred to in subsection (2) (b) has been accepted by a dam safety officer. (4) An owner of a dam must ensure that all drilling, trenching, test pit excavations and other invasive activities involved in an invasive investigation are directly supervised by an engineering professional who has qualifications and experience in dam design, construction and analysis.
Read the Dam Safety Regulation on BC Laws ↗

Made under Water Sustainability Act, SBC 2014, c. 15.