Groundwater Protection Regulation, B.C. Reg. 39/2016
Section 61
Conveyance of urban runoff — recharge wells and injection wells
Cite as Groundwater Protection Regulation, B.C. Reg. 39/2016, s. 61 · last amended December 1, 2022 · read from BC Laws on November 17, 2026
The text
The owner of a recharge well or injection well constructed for the purpose of conveying urban runoff into the ground must ensure that the recharge well or injection well is completed, equipped, operated and maintained
(a) in accordance with the design referred to in section 19 (1) [siting of recharge wells and injection wells] and the applicable terms and conditions, if any, and
(b) so that the recharge well or injection well does not cause a significant adverse impact on the quality of water in an aquifer or in another well that diverts water from the aquifer.
Read the Groundwater Protection Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.