Water Sustainability Fees, Rentals and Charges Tariff Regulation, B.C. Reg. 37/2016
Schedule 2
Schedule 2
Cite as Water Sustainability Fees, Rentals and Charges Tariff Regulation, B.C. Reg. 37/2016, Schedule 2 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
Schedule 2
[am. B.C. Reg. 151/2016, s. (b).]
Water Rentals
Table 1
Licences and Use Approvals Column 1
Water Use Purpose / Class Column 2
Minimum Annual
Rental
($) Column 3
Quantity Based
Rental
($/1 000 m3 unless
otherwise specified)
Conservation Water Use Purpose conservation use 25 0.02 storage associated with conservation use 25 $25 flat rate construction of works in and about a stream —
associated with conservation purpose 25 $25 flat rate
Domestic Water Use Purpose domestic use 50 2.25
Industrial Water Use Purpose bulk shipment for marine transport 200 2.25 camp and public facility 50 2.25 commercial enterprise 200 2.25 cooling 200 1.30 crop harvesting and processing 50 0.85 fish hatcheries 200 0.11 fresh water bottling 200 2.25 greenhouse and nursery 50 0.85 heat exchange 200 2.25 ice and snow making 200 2.25 lawn, fairway and garden 50 0.85 livestock and animal 50 0.85 miscellaneous industrial 200 $200 flat rate pond and aquaculture 50 $50 flat rate processing and manufacturing 200 2.25 pulp mills 200 1.30 quantity actually
used
0.85 difference
between quantity
actually used and
licensed quantity residential heat exchange 50 2.25 swimming pool 50 $50 flat rate vehicle and equipment 200 2.25 waste management 200 2.25 water well drilling, transportation and utility
corridor management 200 2.25
Irrigation Water Use Purpose water conveyed by local provider for irrigation purpose 50 0.85 private irrigation 50 0.85
Land Improvement Water Use Purpose land improvement for rehabilitation or remediation purposes 50 $50 flat rate land improvement — general 50 $50 flat rate
Mineralized Water Use Purpose commercial bathing pool 200 2.25 bottling and commercial distribution 200 2.25
Mining Water Use Purpose hydraulic mining 200 1.30 placer mining 200 1.30 processing ore 200 2.25 washing coal 200 2.25
Oil and Gas Water Use Purpose oil field injection — other than deep groundwater 200 2.25 oil field injection — deep groundwater 0 0 hydraulic fracturing — other than deep groundwater 200 2.25 hydraulic fracturing — deep groundwater 0 0 drilling 200 2.25
Storage Water Use Purpose storage 25 0.02
Waterworks Water Use Purpose water conveyed and used by a local provider for waterworks purpose 200 2.25 water conveyed and used for waterworks purpose by a person other than a local provider 200 2.25 water sales 200 2.25 water delivery 200 2.25
Table 2
Power Purpose Rentals — 2015/16 Column 1
Power Use
Category Column 2
Class of Capacity and Output or
Minimum Annual Rentals Column 3
Rental Rates 2015 2016
[section 24] Commercial Construction capacity $0.347/kW Adjusted Operating capacity $2.165/kW Adjusted Output $1.301/MWh Adjusted Minimum annual rental for each licence $105.82 Adjusted General Construction capacity $0.433/kW Adjusted Operating capacity $4.334/kW Adjusted Output ≤160 000 MWh $1.301/MWh Adjusted Output >160 000 MWh to
≤ 3 000 000 MWh $6.066/MWh Adjusted Output > 3 000 000 MWh $7.298/MWh Adjusted Minimum annual rental for each licence $211.63 Adjusted Residential Licensed quantity $0.02/1 000 m3 $0.02/1 000 m3 Minimum annual rental for each licence $200 $200
Table 2
Power Purpose Rentals — 2017 Column 1
Power Use
Category Column 2
Class of Capacity and Output or
Minimum Annual Rental Column 3
Rental Rates
2017
[section 24] Commercial Construction capacity Adjusted Operating capacity Adjusted Output Adjusted Minimum annual rental for each licence Adjusted General Construction capacity Adjusted Operating capacity Adjusted Output ≤160 000 MWh Adjusted Output >160 000 MWh to
≤ 3 000 000 MWh Adjusted Output > 3 000 000 MWh 1/4 of Adjusted rate
+ 3/4 adjusted rate
for output
> 160 000 to
≤ 3 000 000 MWh Minimum annual rental for each licence Adjusted Residential Licensed quantity $0.02/1 000 m3 Minimum annual rental for each licence $200
Table 2
Power Purpose Rentals — 2018 and Later Years Column 1
Power Use
Category Column 2
Class of Capacity and Output or
Minimum Annual Rental Column 3
Rental Rates
2018 and Later Years
[section 24] Commercial Construction capacity Adjusted Operating capacity Adjusted Output Adjusted Minimum annual rental for each licence Adjusted General Construction capacity Adjusted Operating capacity Adjusted Output ≤ 160 000 MWh Adjusted Output > 160 000 MWh Adjusted rate for
output >160 000
MWh to ≤
3 000 000 MWh Minimum annual rental for each licence Adjusted Residential Licensed quantity $0.02/1 000 m3 Minimum annual rental for each licence $200
Table 3
Permit Rentals Column 1
Land Use Column 2
Minimum Annual
Rental
($) Column 3
Quantity Based Rental
($/ha) Land occupied by dam 100 120 Land flooded or occupied by other works 20 7.50
Read the Water Sustainability Fees, Rentals and Charges Tariff Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.