Water Sustainability Fees, Rentals and Charges Tariff Regulation, B.C. Reg. 37/2016
Section 18
Determination of fees, rentals and charges
Cite as Water Sustainability Fees, Rentals and Charges Tariff Regulation, B.C. Reg. 37/2016, s. 18 · last amended September 1, 2023 · read from BC Laws on November 17, 2026
The text
(1) The sum of the following must be determined separately for each power development:
(a) the amount determined by multiplying the construction capacity for the power development by the applicable rate set out in column 3 of Table 2 of Schedule 2 for construction capacity opposite the power use category set out in column 1;
(b) the amount determined by multiplying the operating capacity for the power development by the applicable rate set out in column 3 of Table 2 of Schedule 2 for operating capacity opposite the power use category set out in column 1 and the applicable class of output set out in column 2;
(c) the amount determined by multiplying the output for the power development by the applicable rate set out in column 3 of Table 2 of Schedule 2 for output opposite the power use category set out in column 1 and the applicable class of output set out in column 2.
(2) The annual rental for a licensee who holds one or more licences for a power purpose in relation to a single power development is the applicable of the following:
(a) if the amount calculated under subsection (1) for the power development is less than or equal to the amount set out in column 3 opposite the minimum annual rental set out in column 2 of Table 2 of Schedule 2 for the power use category set out opposite in column 1, that minimum annual rental;
(b) unless paragraph (a) applies, the amount calculated under subsection (1) for the power development.
(3) The annual rental for a licensee who holds one or more licences for a power purpose in relation to more than one power development is the sum of the following:
(a) if the amount calculated under subsection (1) for one or more of the power developments is less than or equal to the amount set out in column 3 opposite the minimum annual rental set out in column 2 of Table 2 of Schedule 2 for the power use category set out opposite in column 1, the sum of the minimum annual rentals for those power developments;
(b) if the amount calculated under subsection (1) for one or more of the power developments is greater than the amount set out in column 2 opposite the minimum annual rental set out in column 2 of Table 2 of Schedule 2 for the power use category set out opposite in column 1, the sum of the following for those power developments:
(i) the amount determined by multiplying the sum of the construction capacities for those power developments by the applicable rate set out in column 3 of Table 2 of Schedule 2 for construction capacity opposite the power use category set out in column 1;
(ii) the amount determined by multiplying the sum of the operating capacities for those power developments by the applicable rate set out in column 3 of Table 2 of Schedule 2 for operating capacity opposite the power use category set out in column 1;
(iii) the amount determined by multiplying the sum of the outputs for those power developments by the applicable rate set out in column 3 of Table 2 of Schedule 2 for output opposite the power use category set out in column 1 and the applicable class of output set out in column 2.
(4) For the purposes of determining rental amounts for the current calendar year in relation to a licensee, the comptroller must use the operating capacity and construction capacity for the current calendar year and output of the power development for the previous calendar year, and the comptroller may estimate that operating capacity and construction capacity and determine that output using
(a) reports submitted by the licensee on request of the comptroller, a water manager or an engineer, including, without limitation, beneficial use declarations,
(b) power sales records of a licensee and power consumption and output records of adjacent and integrated facilities submitted on request of the comptroller, a water manager or an engineer,
(c) records produced under section 116 (2) [records and reporting] of the Act, and
(d) other relevant evidence.
(5) If output transfers in accordance with section 22 [additional fees in respect of certain downstream benefits] or 26 [consignment agreements] have taken place in the calendar year immediately preceding the calendar year of a determination under subsection (1) of this section, the total of the output referred to in subsection (1) (c) or (3) (b) (iii), as applicable, must be adjusted as required under those sections.
(6) If the authorized capacity, as defined in section 1 (1) of the Water Regulation, B.C. Reg. 204/88, as it read immediately before its repeal, is expressed in horsepower, the electrical equivalents for operating capacity and output may be determined, for rental purposes, by assuming that one kilowatt is equal to 1.341286 horsepower.
Read the Water Sustainability Fees, Rentals and Charges Tariff Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.