Contaminated Sites Regulation, B.C. Reg. 375/96
Section 46.1
Soil management plan
Cite as Contaminated Sites Regulation, B.C. Reg. 375/96, s. 46.1 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) For the purposes of section 55.1 (2) (a) of the Act, the owner of a high volume site must
(a) have a soil management plan for the site, and
(b) manage the site in accordance with that soil management plan until the site is closed.
(2) A soil management plan for a high volume site must be
(a) developed by a qualified professional, and
(b) approved by an approved professional other than the qualified professional who developed the plan.
(3) A soil management plan for a high volume site must
(a) ensure the managed soil at the site is contained so that substances in that soil do not migrate from the site in concentrations sufficient to cause contamination at another site, and
(b) without limiting paragraph (a),
(i) set out procedures for
(A) the detailed tracking of the source sites of the managed soil at the site and the locations at the site where the managed soil from each source site is deposited, and
(B) seasonal groundwater monitoring, and
(ii) include a plan for closure of the high volume site.
(4) A soil management plan under subsection (1) for a high volume site must be implemented under the supervision of a qualified professional.
(5) A closure plan under subsection (3) (b) (ii) must provide that the site must not be closed until
(a) the operator has ceased accepting relocated industrial or commercial site soil for deposit at the site, other than soil exempt under section 45 (3), and
(b) an approved professional has given an opinion that
(i) the substances in the managed soil at the site are stable, in accordance with the director's protocols, and
(ii) seasonal groundwater monitoring is no longer required for the purposes described in subsection (3) (a) of this section.
(6) An opinion referred to in subsection (5) (b) must be in writing and must set out the reasons on which the opinion is based.
(7) The owner of a high volume site must retain a copy of the soil management plan for the site for at least 10 years after the site is closed.
Read the Contaminated Sites Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.