The text
(1) Section 55 (1.1) [removal of soil — notice] of the Act applies to the removal of soil from a source site to a receiving site unless the soil is exempt under
(a) section 55 (1.4) [removal of small amounts of soil] of the Act,
(b) section 55 (5) [removal of soil that is waste] of the Act, or
(c) subsection (2) of this section.
(2) A removal of soil to a receiving site is exempt from section 55 (1.1) of the Act in any of the following circumstances:
(a) the receiving site is outside of British Columbia;
(b) the receiving site is on federal land, other than a reserve within the meaning of the Indian Act (Canada);
(c) the source site is being or has been used for the mining of marl, earth, soil, peat, sand, gravel, dimension stone, rock or any natural substance that is used for a construction purpose on land and the soil
(i) was extracted in accordance with a permit under the Mines Act, and
(ii) was not affected by a specified industrial or commercial use or another source of contamination;
(d) the soil is preload that was originally extracted from a site used for a low-impact land use, whether or not the source site is used for a low-impact land use;
(e) the soil is winter-maintenance sand.
(2.1) Without limiting subsection (2), a removal of soil to a receiving site is exempt from section 55 (1.1) of the Act if all of the following circumstances apply:
(a) the source site is the subject of either
(i) a final determination under section 44 (2) (d) of the Act that the site is not a contaminated site, or
(ii) a certificate of compliance that the site has been remediated in accordance with the numerical standards referred to in section 53 (3) (a) (i) of the Act;
(b) the soil has not been contaminated since the final determination or certificate of compliance was issued;
(c) the soil, at any depth, and vapour at the source site does not contain any substance with a concentration greater than or equal to the numerical standard for the soil or vapour, respectively, that applies to the receiving site.
(3) For the purposes of section 55 (1.4) of the Act, the following amount of soil is prescribed as exempt from section 55 (1.1) of the Act:
(a) in the case of soil removed from a source site classified under a director's protocol as low, moderate, medium or intermediate risk, the prescribed amount is 30 cubic metres calculated in accordance with subsection (4) of this section;
(b) in the case of soil removed from a source site classified under a director's protocol as high risk, no amount is prescribed.
(4) For the purposes of subsection (3) (a), the amount of soil removed is to be calculated by adding the amounts removed over the course of the same project in any period of 2 years.