Water Sustainability Regulation, B.C. Reg. 36/2016
Section 43
Protection of water quality
Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 43 · last amended May 11, 2026 · read from BC Laws on November 17, 2026
The text
(1) A person making an authorized change in accordance with this Part must ensure that
(a) making the authorized change does not cause a significant adverse impact on the ambient water quality of the stream,
(b) there is no disturbance or removal of stable natural materials and vegetation in and about the stream that contribute to stream channel stability except as authorized under this Part and in accordance with any terms and conditions specified by a habitat officer under section 44 (2) [protection of aquatic ecosystem],
(c) temporary material, fill, bridges, culverts, pumps, pipes, conduits, ditches or other structures used to assist in the construction of any works are constructed and maintained only for the period of construction and are removed on completion of the works,
(d) all cast-in-place concrete and grouting is completely separated from fish-bearing waters for a minimum of 48 hours,
(e) rock from acid-generating rock formations is not used for construction, and
(f) on completion of the authorized change the stream is restored to the state that existed before the authorized change was made.
(2) Subsection (1) (c) does not apply in relation to a person making an authorized change described in section 39 (5) [authorized changes].
Read the Water Sustainability Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.