Water Sustainability Regulation, B.C. Reg. 36/2016
Section 39
Authorized changes
Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 39 · last amended May 11, 2026 · read from BC Laws on November 17, 2026
The text
(1) The following changes in and about a stream are authorized changes:
(a) the installation, maintenance or removal of a culvert for crossing a stream for the purposes of a road, trail or footpath, if all the following conditions are met:
(i) the equipment used for site preparation, or for installation, construction, maintenance or removal of the culvert, is situated in a dry stream channel or operated from the top of the bank;
(ii) if the stream is fish-bearing, the culvert allows fish in the stream to pass up or down stream under all flow conditions;
(iii) the culvert inlet and outlet incorporate measures to protect the structure and the stream channel against erosion;
(iv) debris can pass through the culvert;
(v) the installation, maintenance or removal of the culvert does not destabilize the stream channel;
(vi) the culvert and its approach roads do not produce a backwater effect or increase the head of the stream;
(vii) the culvert capacity is equivalent to the hydraulic capacity of the stream channel or is capable of passing the 1 in 200 year maximum daily flow without the water level at the culvert inlet exceeding the top of the culvert;
(viii) the culvert has a minimum equivalent diameter of 600 mm;
(ix) if the culvert has an equivalent diameter of 2 m or greater, or has a design capacity to pass a flow of more than 6 m3 per second, the culvert is designed by an engineering professional and constructed in conformance with that design;
(x) the culvert is installed in a manner that permits the removal of obstacles and debris within the culvert and at the culvert ends;
(xi) if the changes in and about the stream are related to a right of way, the stream channel, except the portion within the right of way, is not altered;
(xii) embankment fill materials do not, and are unlikely to, encroach on culvert inlets and outlets;
(xiii) the culvert has a depth of fill cover that is at least 300 mm or as required by the culvert manufacturer's specifications;
(xiv) the maximum fill heights above the top of the culvert do not exceed 2 m;
(xv) the culvert is made of materials that meet the applicable standards of the Canadian Standards Association;
(b) the construction, maintenance or removal of a clear span bridge, if all the following conditions are met:
(i) the equipment used for site preparation, or for construction, maintenance or removal of the bridge is situated in a dry stream channel or operated from the top of the bank;
(ii) the bridge and its approach roads do not produce a back water effect or increase the head of the stream;
(iii) the hydraulic capacity of the bridge is equivalent to the hydraulic capacity of the stream channel, or is capable of passing the 1 in 200 year maximum daily flow;
(iv) the height of the underside of the bridge is adequate to provide free passage of flood debris and ice flows;
(v) the bridge is made of materials that meet the applicable standards of the Canadian Standards Association;
(c) the construction or maintenance of a pipeline crossing of a stream, if either of the following conditions is met:
(i) the pipeline and associated works are installed in a dry stream channel at a depth so that the top of the pipe is at least 1 m below the lowest elevation of the bed of the stream;
(ii) in the case of an aerial crossing, the crossing is constructed in accordance with the conditions of paragraph (b) for clear span bridges;
(d) the construction, maintenance or removal of a pier or wharf in a stream, if the ebb and flow of water and the movement of material under the influence of waves or currents is not obstructed;
(e) the construction, maintenance or removal by the Crown in right of either Canada or British Columbia of a flow or water level measuring device in a stream;
(f) the construction or removal by the Crown in right of either Canada or British Columbia of a fish fence, fish screen or fish or game guard across a stream if the fence, screen or guard is designed, constructed, maintained and used in a manner that does not obstruct the flow of water in the stream;
(g) the restoration or maintenance of a stream channel or the aquatic ecosystem by any of the following:
(i) the government of British Columbia, a government corporation or a government agent;
(ii) a municipality or regional district;
(iii) the trust council, a local trust committee, the executive committee and the Islands Trust Conservancy, as those terms are defined in the Islands Trust Act;
(iv) an improvement district, the Greater Vancouver Sewerage and Drainage District or the Greater Vancouver Water District;
(v) a diking authority within the meaning of the Dike Maintenance Act;
(vi) a first nation government within the meaning of section 69 of the Act;
(vii) the Westbank First Nation as defined in the agreement approved under the Westbank First Nation Self-Government Act (Canada);
(viii) the shíshálh Nation continued under the shíshálh Nation Self-Government Act (Canada);
(h) Repealed. [B.C. Reg. 18/2026, App. 1, s. 4 (a).]
(i) the mechanical or manual cutting of annual vegetation within a stream channel;
(j) the restoration or maintenance of the aquatic ecosystem by the government of Canada;
(k) the repair or maintenance of existing dikes or existing erosion protection works to their original state, if the dikes or works were functional during the previous year;
(l) the construction or maintenance of storm sewer outfalls, if both the following conditions are met:
(i) the storm sewer outfall is designed by an engineering professional;
(ii) the storm sewer outfall is constructed, maintained and used in a manner that does not obstruct the flow of water in the stream or cause erosion of the stream channel;
(m) the mechanical or manual control of Eurasian watermilfoil and other invasive species of aquatic vegetation by a land owner, a municipality, a regional district or the Greater Vancouver Water District, or an improvement district or other body, established or continued under an enactment, that has jurisdiction in relation to the control of invasive aquatic vegetation;
(n) the construction or maintenance of ice bridges, winter fords or snowfills if,
(i) in the cases of ice bridges, winter fords or snowfills, only clean ice and snow are used in the construction or maintenance and are removed from the stream channel before ice breakup, and
(ii) in the case of ice bridges, any logs, timber and other structural materials used are removed, before ice breakup, without causing a significant risk of harm to public safety, the environment, land or other property;
(n.1) the construction or maintenance of ice roads within the meaning of section 34.31 (1) if
(i) all of the conditions set out in section 34.31 (2) are met,
(ii) only clean ice, snow and water are used in the construction or maintenance and are removed from the stream channel before ice breakup, and
(iii) any logs, timber and other structural materials used are removed, before ice breakup, without causing a significant risk of harm to public safety, the environment, land or other property;
(o) the construction or placement, under the direction of the Crown in right of British Columbia, a municipality or a regional district, or an agent of any of them, of erosion protection works or flood protection works during a declaration of a state of provincial emergency or declaration of a state of local emergency, made under the Emergency and Disaster Management Act, that involves flooding;
(p) the clearing of an obstruction from a bridge or culvert by the Crown in right of British Columbia, a municipality or a regional district during a flood, if the obstruction is causing or has the potential to cause a significant risk of harm to public safety, the environment, land or other property;
(q) the installation or cleaning of drainage outlets;
(r) the repair or maintenance of the superstructure of a bridge, other than the bridge's foundation;
(s) the installation, repair, maintenance or removal of a fence, if the fencing materials
(i) are not in the stream channel,
(ii) do not block debris in the stream channel, and
(iii) do not interfere with navigation of the stream;
(t) maintenance of a minor and routine nature by a public utility of its works;
(u) the removal of a beaver dam under section 9 of the Wildlife Act, if the removal is carried out in such a manner that downstream flooding and erosion do not occur;
(v) the construction of a temporary ford for vehicular traffic across a stream, if
(i) the construction occurs at a time in the year during which the construction can occur without causing a risk of significant harm to fish, wildlife or the aquatic ecosystem of the stream,
(ii) the 1 in 10 year maximum daily flow over the ford is accommodated without the loss of the ford and without eroding the stream channel,
(iii) any culvert is designed and installed to pass the average low flow for the period of use,
(iv) the stream channel is protected against any anticipated erosion
(A) for the period of construction and use of the ford, and
(B) after the ford is removed,
(v) sediment from approach ditches does not enter the stream,
(vi) the driveable running surface is erosion-free,
(vii) the stream remains in its channel,
(viii) channel debris will pass over the ford, and
(ix) the ford is removed at the end of the period of use at a time when the removal can proceed without causing a risk of significant harm to fish, wildlife or the aquatic ecosystem of the stream;
(w) the construction of a temporary diversion around or through a worksite for the purposes of constructing or maintaining bridge abutments, constructing or maintaining piers other than bridge piers, maintaining bridge piers or constructing works authorized under this section, if
(i) the size of the worksite is minimized,
(ii) any pumps, pipes or conduits used to divert water around or through the worksite are sized to divert the 1 in 10 year maximum daily flow for the period of construction,
(iii) any pump or intake withdrawing water from a fish-bearing stream is screened to prevent potential loss of fish due to entrainment or impingement,
(iv) any cofferdams used to isolate successive parts of the construction occurring at the worksite are designed by an engineering professional and constructed in accordance with that design,
(v) the natural channel remaining outside of any cofferdams is adequate to pass the 1 in 10 year maximum daily flow for the period of construction,
(vi) the flow of water diverted around the worksite using ditches remains within the stream channel,
(vii) any ditches used to divert the flow of water around the worksite are designed and constructed to divert the 1 in 10 year maximum daily flow around or through the worksite and are protected from any anticipated erosion for the period of construction and use of the ditch, and
(viii) any ditches are completely backfilled and the area returned as closely as possible to the state that existed before the changes in and about the stream were made;
(x) the construction and maintenance of a dry hydrant in a stream if
(i) the dry hydrant is designed by an engineering professional, and
(ii) the dry hydrant is constructed, maintained and used in a manner that does not cause erosion of the stream channel or sedimentation in the stream.
(2) A change in and about a stream to which a standard or regulation under the Forest and Range Practices Act applies is an authorized change if
(a) the change is made by
(i) a municipality, a regional district or another person who
(A) holds an agreement or road use permit under the Forest Act, an agreement under the Range Act or a special use permit under the Forest Practices Code of British Columbia Act, or
(B) is authorized under the Coal Act, the Geothermal Resources Act, the Mining Right of Way Act or the Petroleum and Natural Gas Act to construct or modify a road, or
(ii) the Crown in right of British Columbia, and
(b) the person making the change complies with the Forest and Range Practices Act and the regulations and standards established under that Act.
(3) A change in and about a stream is an authorized change if
(a) the change is made by a person who holds a permit under section 10 of the Mines Act, and
(b) the person making the change complies with
(i) Part 9 of the Health, Safety and Reclamation Code for Mines in British Columbia, and
(ii) the conditions included in the permit respecting changes in and about the stream.
(4) For the purposes of section 38, an application for a permit to carry out exploration activities under section 10 of the Mines Act constitutes notice of the change.
(5) A change in and about a stream is an authorized change if
(a) the activities in relation to which the change in and about the stream is to be made are authorized by a permit issued under the Energy Resource Activities Act, and
(b) the change in and about the stream is made in accordance with
(i) applicable regulations under the Energy Resource Activities Act, and
(ii) the conditions respecting changes in and about the stream included in the permit.
(6) If a person making changes in and about a stream under subsection (5) causes damage to an aquatic ecosystem, which damage is not authorized under the Energy Resource Activities Act or the permit referred to in that subsection, the person must
(a) report the damage to the British Columbia Energy Regulator within 72 hours after the damage is caused, and
(b) take any action ordered under the Energy Resource Activities Act by an official, as defined in that Act, to repair the damage and restore the aquatic ecosystem.
Read the Water Sustainability Regulation on BC Laws ↗
Made under Water Sustainability Act, SBC 2014, c. 15.