Water Sustainability Regulation, B.C. Reg. 36/2016

Section 3

Applications for licences and use approvals

Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 3 · last amended May 11, 2026 · read from BC Laws on November 17, 2026

The text

(1) An application to a decision maker for an authorization must include all the following information, as applicable: (a) the full name of the applicant and a mailing address, a telephone number and, if available, an email address at which the applicant or the applicant's agent may be contacted; (b) the official name of the stream or aquifer that is the proposed source of the water, or, if there is no official name, a location description of that stream or aquifer; (c) if the application relates to water in a stream, the official name of the stream into which the proposed source of the water discharges or is immediately tributary, or, if there is no official name for the stream, a location description of that stream; (d) if the application relates to water in an aquifer, the official names of each stream or other aquifer known to the applicant to be reasonably likely to be hydraulically connected to the source aquifer, or, if there is no official name, a location description of that stream or aquifer; (e) if water is to be stored under the authorization, the official name of the proposed reservoir, or, if there is no official name, a location description of that reservoir; (f) the water use purposes for which the water is to be used; (g) the quantity of water proposed to be diverted or stored for each water use purpose identified under paragraph (f), and, in the case of a power purpose, the amount of power proposed to be generated; (h) if the water is not to be diverted or used throughout the year, the periods in the year during which the water will be diverted or used; (i) a location description of the land, mine or undertaking to which the authorization is to be appurtenant or a general description of the project or scheme of water use; (j) if the land described in paragraph (i), (l) or (n) is Crown land, proof of the applicant's authority to occupy the Crown land, proof that an application for a disposition of the Crown land has been made or the applicant's request for a permit in relation to that Crown land; (k) if the water use purposes of the authorization include an irrigation purpose, the measurements of the area of land to be irrigated; (l) an identification of the location of the point of diversion, or diversion and storage, if applicable, either by location description or by reference to the location of a known feature; (m) a detailed description of the proposed works for the proposed diversion or use, including, without limitation, in relation to a well, the depth of the well or proposed well and, if available, any well report that has been prepared in respect of the well and the well identification plate number or well tag number; (n) a location description of (i) the land on which the applicant proposes to construct works, and (ii) any land that is likely to be physically affected by the proposed works; (o) the applicant's title to or other interest in the appurtenancy referred to in paragraph (i) and the name of the owner of any land described in paragraph (l) or (n) that is not owned by the applicant; (p) an accurate labelled drawing, to scale, showing all the following: (i) the location and boundaries of the appurtenancy and the location within the appurtenancy where the water is to be used; (ii) the approximate location of the proposed works; (iii) the boundaries of any land that is likely to be physically affected by the proposed works; (iv) if the water source is an aquifer, streams and other water bodies, whether natural or otherwise, other wells that are diverting water from the aquifer and other water features in the area shown in the drawing, if known to the applicant; (v) if the water source is a stream, the location of the stream and the direction of flow. (2) A decision maker must not authorize in a use approval water storage by a dam to which Part 2 of the Dam Safety Regulation applies unless the dam is authorized by a licence. (3) An application for a licence or, subject to subsection (2), a use approval, that proposes the storage of water by a dam must include all the following information, as applicable: (a) the height or proposed height of the dam; (b) the length or proposed length of the dam; (c) the crest width or proposed crest width of the dam; (d) the maximum volume of water proposed to be stored by the dam.
Read the Water Sustainability Regulation on BC Laws ↗

Made under Water Sustainability Act, SBC 2014, c. 15.