Water Sustainability Regulation, B.C. Reg. 36/2016

Section 20

Mitigation measures

Cite as Water Sustainability Regulation, B.C. Reg. 36/2016, s. 20 · last amended May 11, 2026 · read from BC Laws on November 17, 2026

The text

(1) For the purposes of section 17 (2) [sensitive streams mitigation] of the Act, the mitigation measures that must be proposed under that subsection must include all the following in relation to the worksite for each of the project planning, design, construction and operational phases: (a) strategies relating to the timing for the construction of any proposed works; (b) practices to be undertaken to ensure stream bank and channel stability; (c) practices to be undertaken to provide for satisfactory fish migration; (d) practices to be undertaken to ensure that fish are not injured and their migration is not hindered by structures, pumping devices or construction activities; (e) practices and procedures to be undertaken to maintain water quality in the stream; (f) measures to be undertaken to restore the stream channel to the state that exists before the work proposed by the application begins; (g) measurement and reporting of water use; (h) measures to be undertaken in respect of water conservation. (2) If, for the purposes of section 17 (3) of the Act, the decision maker imposes a term or condition on the authorization or change approval, or amendment to the authorization or change approval, that the holder implement mitigation measures, it is a term and condition of the authorization, change approval or amendment that the holder ensure that the following are monitored, by a person whose qualifications are acceptable to the decision maker, to ensure that they are performed and maintained in accordance with the Act, the regulations and the authorization, change approval or amendment: (a) the construction of the works authorized under the authorization, change approval or amendment; (b) the implementation of the mitigation measures required under the authorization, change approval or amendment. (3) It is a term and condition of an authorization, change approval or amendment referred to in subsection (2) that the monitoring required under that subsection may be discontinued only if (a) the person whose qualifications are acceptable to the director under subsection (2) certifies in writing that all works have been completed and are functioning as required, and (b) the holder of the authorization or change approval is relieved of the monitoring and maintenance requirement by the comptroller or a water manager or, in the case of a change approval, by an engineer.
Read the Water Sustainability Regulation on BC Laws ↗

Made under Water Sustainability Act, SBC 2014, c. 15.