Architects Regulation, B.C. Reg. 33/2023

Schedule 1

Schedule 1

Cite as Architects Regulation, B.C. Reg. 33/2023, Schedule 1 · last amended June 2, 2023 · read from BC Laws on November 17, 2026

The text

Schedule 1 Buildings Within the Reserved Practice of Architecture and the Reserved Practice of Professional Engineering 1 The following types of buildings are set out for the purposes of section 5 (3) (b) of this regulation: (a) a specialized industrial building that shelters, or is a component of, an industrial process, including the following: (i) Repealed. [B.C. Reg. 136/2023, App. B, s. 5 (a).] (ii) a grain elevator; (iii) Repealed. [B.C. Reg. 136/2023, App. B, s. 5 (a).] (iv) a chemical manufacturing or processing plant; (v) a waste processing plant; (vi) a bulk plant for a flammable liquids; (vii) a bulk storage warehouse for hazardous substances; (b) an outdoor stage without fixed seating or ancillary facilities; (c) an unheated industrial roof; (d) an unheated industrial shed; (e) an unheated tent building for industrial use; (f) a farm building as defined in the building code that is within an industrial occupancy type; (g) a power-generating station; (h) an electrical substation; (i) a public water treatment and storage facility; (j) a pumping station; (k) a sewage treatment facility; (l) sheltering for vehicles, including aircraft and boats, used for emergency response.
Read the Architects Regulation on BC Laws ↗

Made under Professional Governance Act, SBC 2018, c. 47.