Demand-Side Measures Regulation, B.C. Reg. 326/2008

Section 3

Adequacy

Cite as Demand-Side Measures Regulation, B.C. Reg. 326/2008, s. 3 · last amended June 30, 2023 · read from BC Laws on November 17, 2026

The text

(1) A public utility's plan portfolio is adequate for the purposes of section 44.1 (8) (c) of the Act only if the plan portfolio includes all of the following: (a) a demand-side measure intended specifically (i) to assist residents of low-income households to reduce their energy consumption, or (ii) to reduce energy consumption in housing owned or operated by (A) a housing provider that is a local government, a society as defined in section 1 of the Societies Act, other than a member-funded society as defined in section 190 of that Act, or an association as defined in section 1 (1) of the Cooperative Association Act, (B) Repealed. [B.C. Reg. 167/2023, s. 3 (b).] if the benefits of the reduction primarily accrue to (C) the low-income households occupying the housing, or (D) a housing provider referred to in clause (A), (E) Repealed. [B.C. Reg. 167/2023, s. 3 (e).] (b) if the plan portfolio is submitted on or after June 1, 2009, a demand-side measure intended specifically to improve the energy efficiency of rental accommodations; (c) an education program for students enrolled in schools in the public utility's service area; (d) if the plan portfolio is submitted on or after June 1, 2009, an education program for students enrolled in post-secondary institutions in the public utility's service area; (e) one or more demand-side measures to provide resources as set out in paragraph (g) of the definition of "class A demand-side measure", representing no less than (i) an average of 1% of the public utility's plan portfolio's expenditures per year over the portfolio's period of expenditures, or (ii) an average of $2 million per year over the portfolio's period of expenditures; (f) one or more demand-side measures intended to result in the adoption by local governments and first nations of a step; (g) a demand-side measure intended specifically to reduce energy consumption in any of the following: (i) housing owned or operated by an Indigenous governing body or located on reserve land; (ii) a public building owned or operated by an Indigenous governing body. (2) The commission, when considering whether a plan portfolio is adequate under subsection (1), may consider a demand-side measure that is not included in the plan portfolio to be a part of the plan portfolio.
Read the Demand-Side Measures Regulation on BC Laws ↗

Made under Utilities Commission Act, RSBC 1996, c. 473.