Sewerage System Regulation, B.C. Reg. 326/2004
Section 9
Letter of certification
Cite as Sewerage System Regulation, B.C. Reg. 326/2004, s. 9 · last amended March 30, 2022 · read from BC Laws on November 17, 2026
The text
(1) Within 30 days of completing the construction of a sewerage system to which section 8 [filing] applies, an authorized person must
(a) provide the owner with
(i) a copy of the sewerage system plans and specifications as provided to the health authority under section 8 (2) (b),
(ii) a maintenance plan for the sewerage system that is consistent with standard practice, and
(iii) a copy of the letter of certification provided to the health authority under paragraph (b),
(b) file with the health authority a signed letter certifying that
(i) the authorized person has complied with the requirements of paragraph (a),
(ii) the sewerage system has been constructed in accordance with standard practice,
(iii) the sewerage system has been constructed substantially in accordance with the plans and specifications filed under section 8 (2) (b),
(iv) for a sewerage system described in section 2 (c) or (d) [application], the estimated daily domestic sewage flow through the sewerage system will be less than 22 700 litres, and
(v) if operated and maintained as set out in the maintenance plan, the sewerage system will not cause a health hazard, and
(c) append to the letter required under paragraph (b)
(i) a plan of the sewerage system as it was built, and
(ii) a copy of the maintenance plan for the sewerage system.
(2) To determine whether sewerage system construction and a maintenance plan in respect of the sewerage system are consistent with standard practice, an authorized person may have regard to the minister's ministry publication "Sewerage System Standard Practice Manual", as amended from time to time.
(3) If an authorized person does not file a letter of certification under subsection (1) (b) within 2 years from filing information about the sewerage system under section 8, the authorized person must not begin or continue construction of the sewerage system until the authorized person files new information under section 8.
Read the Sewerage System Regulation on BC Laws ↗
Made under Public Health Act, SBC 2008, c. 28.