Sewerage System Regulation, B.C. Reg. 326/2004

Section 3.1

Setback from wells

Cite as Sewerage System Regulation, B.C. Reg. 326/2004, s. 3.1 · last amended March 30, 2022 · read from BC Laws on November 17, 2026

The text

(1) In this section: “professional” means a professional competent in the area of hydrogeology; “well” means a well used to supply a domestic water system. (2) Subject to subsections (3) and (4) (b), a person must not construct (a) a holding tank less than 15 metres from a well, or (b) a sewerage system less than 30 metres from a well. (3) Subsection (2) does not apply if a person receives, before construction, written advice from a professional that it would not likely cause a health hazard to construct a holding tank or sewerage system at a distance less than the distance required under that subsection. (4) If a person receives from a professional written advice respecting the distance from a well that a holding tank or sewerage system should be constructed to reasonably avoid causing a health hazard, (a) the person must give to a health officer (i) a copy of the advice, and (ii) notice of whether the person intends to construct the holding tank or sewerage system and, if so, the distance from the well the person intends to construct the holding tank or sewerage system, and (b) a person must not construct a holding tank or sewerage system at a distance less than that indicated by the professional.
Read the Sewerage System Regulation on BC Laws ↗

Made under Public Health Act, SBC 2008, c. 28.