Permit and Approval Fees and Charges Regulation, B.C. Reg. 299/92

Section 3

Annual charge for a permit

Cite as Permit and Approval Fees and Charges Regulation, B.C. Reg. 299/92, s. 3 · last amended October 28, 2019 · read from BC Laws on November 17, 2026

The text

(1) Subject to section 5, a permit holder must pay annually a charge for each permit held by the permittee. (2) Subject to subsection (5), the charge for each permit under subsection (1) is calculated by adding the base fee for the permit type, as specified in Column 2 of Schedule A opposite the permit type in Column 1, to the sum of the fees, calculated in accordance with subsection (3), for each contaminant authorized under the permit. (3) The fee for each contaminant under subsection (2) is calculated by multiplying the quantity of the contaminant, determined in accordance with subsection (4), authorized by permit for the 12 months prior to the anniversary date of the permit by the unit fee for that contaminant, as specified in Schedule B, C or D for the applicable payment date as set out in Column 2 opposite the contaminant in Column 1. (4) The quantity of each contaminant discharged that is used to calculate the annual charge is determined from (a) the maximum authorized discharge rate and concentration specified in the permit or by regulation, and (b) the discharge factors as determined in accordance with procedures approved by the director if the permit does not specify the concentration of the contaminants contained in the discharges. (5) The charge for each permit under subsection (1) is the base fee for the permit type, as specified in Column 2 of Schedule A opposite the permit type in Column 1, if the permit (a) authorizes a discharge under one of the following regulations: (i) the Antisapstain Chemical Waste Control Regulation; (ii) the Placer Mining Waste Control Regulation, or (b) is required under section 3.1 (1) of the Organic Matter Recycling Regulation. (6) If a permit is amended after its anniversary date and, as a result, the amount of the annual charge changes, the change to the annual charge takes effect on the next anniversary date.
Read the Permit and Approval Fees and Charges Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.