Renewable Energy Projects Regulation, B.C. Reg. 28/2026
Section 43
Operations
Cite as Renewable Energy Projects Regulation, B.C. Reg. 28/2026, s. 43 · last amended September 14, 2026 · read from BC Laws on November 17, 2026
The text
(1) A permit holder for a renewable energy project must notify the regulator at least 14 days before beginning operations.
(2) A permit holder for a renewable energy project must, before giving a notice of operation start, submit to the regulator
(a) a record referred to in section 11 (b) and (c) [engineering and technical records — plot plans and design documents], if the record has been revised, and
(b) a statement from an engineer that the facility
(i) was designed and constructed in accordance with this regulation and the permit, and
(ii) is safe for operation.
(3) A statement required under subsection (2) (b) must be submitted in the form and manner required by the regulator.
(4) A permit holder for a renewable energy project must notify the regulator as follows:
(a) at least 24 hours before putting new or modified equipment into service;
(b) at least 24 hours before beginning a planned shutdown of the facility or a major component of the facility;
(c) at least 5 days before operations resume after a suspension to which section 40 [suspensions] applies;
(d) at least 60 days before beginning the decommissioning process and on completing the decommissioning process.
Read the Renewable Energy Projects Regulation on BC Laws ↗