Drilling and Production Regulation, B.C. Reg. 282/2010
Section 63
Gas well tests
Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 63 · last amended April 1, 2025 · read from BC Laws on November 17, 2026
The text
(1) Subject to subsection (3), before 6 months have elapsed after a permit holder has first placed a gas well on production, the permit holder must flow test the well and determine the absolute open flow potential if
(a) the well is producing from a pool with suspected water drive, or
(b) the well is classified as an exploratory outpost well or exploratory wildcat well.
(2) A permit holder must submit to the regulator, within 60 days of the date on which the operation concluded, a detailed report of
(a) any gas well flow test for which temporary flow testing equipment is used to measure pressures and rates of each fluid,
(b) any cleanup flow that results in burnable gas to the surface, and
(c) any underbalanced drilling that results in burnable gas to the surface.
(3) Subsection (1) does not apply with respect to a well completed in an unconventional zone listed in Schedule 2.
Read the Drilling and Production Regulation on BC Laws ↗
Made under Energy Resource Activities Act, SBC 2008, c. 36.