Drilling and Production Regulation, B.C. Reg. 282/2010

Section 39

Safety and pollution prevention

Cite as Drilling and Production Regulation, B.C. Reg. 282/2010, s. 39 · last amended April 1, 2025 · read from BC Laws on November 17, 2026

The text

(1) In this section, “populated area” means an occupied dwelling, school, picnic ground or other place of public concourse. (2) A permit holder of a completed well or facility must establish and maintain a system to detect and control leaks as quickly as practicable. (3) A permit holder of a completed well or facility must install and maintain fencing or take other access control measures to prevent unauthorized access to the well or facility if (a) the boundary of the well or facility is located within 800 m of a populated area, or (b) a populated area is within the emergency planning zone for the well or facility. (4) If an uncontrolled flow of oil or gas from a completed well, other than a well suspended in accordance with section 25, could produce a hydrogen sulphide concentration greater than 100 ppm in atmosphere within 50 metres of the well, the permit holder of the well must install and maintain (a) an automated system to isolate the well in the event of an uncontrolled flow of oil or gas, and (b) if the well is located within 1 600 m of a populated area, a hydrogen sulphide detection and alarm system that is continuously monitored and is capable of activating the automated system referred to in paragraph (a). (5) If an uncontrolled flow of oil or gas from a facility could produce a hydrogen sulphide concentration greater than 100 ppm in atmosphere at the facility boundary, the permit holder of the facility must install and maintain (a) an automated system to isolate the facility in the event of an uncontrolled flow of oil or gas, and (b) if the facility is located within 1 600 m of a populated area, a hydrogen sulphide detection and alarm system which is continuously monitored and is capable of activating the automated system referred to in paragraph (a). (6) The permit holder of a completed well must do all of the following if the hydrogen sulphide content of the gas exceeds 5 mole percent or a populated area or a numbered highway is within the emergency planning zone for the well: (a) for a completed well not produced by artificial lift, (i) equip the well with 2 master valves, (ii) install a production packer set as closely above the producing formation as is practicable and fill the annular space between the tubing and production casing with a suitable corrosion inhibiting liquid, (iii) install wellhead equipment for which the working pressure rating is not less than the bottom hole pressure of the producing formation, but with a minimum rating of 14 000 kPa, (iv) if a hot oil circulating string is used inside the production casing of a well, install a check valve in the injection line and automatic shutoff valve on the return line, (v) if a well is equipped with a production packer as required under subparagraph (ii), conduct annual segregation tests and, if the test fails, complete repairs without unreasonable delay, and (vi) submit within 30 days of completion a record of the tests and repairs referred to in subparagraph (v); (b) for a flowing well that is located within 800 m of a populated area or within 8 km of a city, town or village and that has the potential to produce more than 30 000 m3 of gas per day, install at least 30 m below the surface a downhole safety valve in the tubing that closes automatically in the event of an uncontrolled flow of oil or gas or a failure in the system which operates the valve; (c) for an acid gas injection or disposal well, install a downhole safety valve in the tubing that (i) is at least 30 m below the surface, and (ii) closes automatically in the event of an uncontrolled flow of oil or gas or a failure in the system that operates the valve. (7) If a well is equipped with an artificial lift after October 4, 2010, and the hydrogen sulphide content of the gas exceeds 100 ppm, the permit holder must, (a) if a pumpjack is the method of artificial lift, (i) install on the stuffing box a device that will (A) shut down the pumping unit in the event of a stuffing box failure, and (B) seal off the well in the event of a polish rod failure, and (ii) install an automatic vibration shutdown system that will safely shut down the pumpjack, or (b) if paragraph (a) does not apply, maintain a system that will shut down the artificial lift if a leak is detected. (8) Repealed. [B.C. Reg. 103/2019, s. 16 (d).] (9) Repealed. [B.C. Reg. 204/2013, s. 3 (b).] (10) Repealed. [B.C. Reg. 282/2010, s. 39 (11).] (11) Spent.
Read the Drilling and Production Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.