Hydrogen Facility Regulation, B.C. Reg. 27/2025

Section 45

Record retention program

Cite as Hydrogen Facility Regulation, B.C. Reg. 27/2025, s. 45 · last amended March 10, 2026 · read from BC Laws on November 17, 2026

The text

A hydrogen facility permit holder must have a record retention program in which all records required under a provision referred to in column 1 of the following table are retained for at least the period or until the occurrence of the event referred to in column 2 opposite the provision: Item Column 1 Records Column 2 Retention 1 section 15 [record drawings] The hydrogen facility is removed from the facility operating area 2 section 41 [construction, post-construction, maintenance and testing records] The equipment is removed from the facility operating area 3 section 42 (a) [operating records — integrity management program] The equipment is removed from the facility operating area 4 section 42 (b), (c) and (d) [operating records] 6 years after the record is made 5 section 42 (e) [operating records — management of change] The hydrogen facility is removed from the facility operating area 6 section 42 (f) [operating records — incidents] If there is an incident investigation: one year after the investigation is closed If there is no incident investigation: 30 days after the incident end 7 section 43 [records of measures to minimize adverse effects — Class 2 hydrogen facility] 3 years after the hydrogen facility is removed from the facility operating area 8 section 44 [suspension and decommissioning records] 3 years after the hydrogen facility is removed from the facility operating area
Read the Hydrogen Facility Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.