Hydrogen Facility Regulation, B.C. Reg. 27/2025
Section 1
Interpretation
Cite as Hydrogen Facility Regulation, B.C. Reg. 27/2025, s. 1 · last amended March 10, 2026 · read from BC Laws on November 17, 2026
The text
(1) In this regulation:
“Act” means the Energy Resource Activities Act;
“Class 1 hydrogen facility” means a hydrogen facility in relation to which both of the following apply:
(a) the maximum aggregate weight of hydrogen at the operating area of the facility is less than 4.5 tonnes;
(b) the facility is not co-located with a facility for manufacturing ammonia or methanol from petroleum, natural gas, water or another substance;
“Class 1 hydrogen facility permit” means a permit that includes permission to construct and operate a Class 1 hydrogen facility;
“Class 2 hydrogen facility” means a hydrogen facility in relation to which all of the following apply:
(a) the maximum aggregate weight of hydrogen at the operating area of the facility is equal to or greater than 4.5 tonnes;
(b) the maximum manufacturing capacity of the facility is less than 100 000 tonnes of hydrogen per year;
(c) the facility is not co-located with a facility for manufacturing ammonia or methanol from petroleum, natural gas, water or another substance;
“Class 2 hydrogen facility permit” means a permit that includes permission to construct and operate a Class 2 hydrogen facility;
“Class 2 hydrogen facility permit holder” means a person who holds a Class 2 hydrogen facility permit;
“codes and standards” means the codes and standards adopted under section 3 [adopted codes and standards] that apply in the context;
“construction” includes assembly;
“decommission” has the meaning given to it in section 39 (1) [decommissioning of hydrogen facility];
“emergency” means an incident classified in accordance with section 33 [incident classification and management] as a level 1, 2 or 3 incident that requires action by a permit holder to protect persons, property or the environment;
“emergency planning zone”, in relation to a hydrogen facility, means a geographical area that encompasses all the hazard planning zones for the facility;
“hazard” means a condition that poses a material threat to life, health, property or the environment;
“hazard planning distance” means a hazard planning distance within the meaning of subsection (2);
“hazard planning zone” means a geographical area
(a) determined by using the hazard planning distance as a radius, and
(b) within which persons, property or the environment may be affected by an emergency;
“hazardous product” has the same meaning as in section 1.1 [definitions] of the Occupational Health and Safety Regulation;
“hydrogen facility” means a facility that manufactures hydrogen;
“hydrogen facility permit holder” means a person who holds a Class 1 hydrogen facility permit or a Class 2 hydrogen facility permit;
“incident” means an incident described in column 1 of the table in Schedule 2;
“local authority” means a municipality or a regional district;
“local Indigenous nation”, in relation to a hazard planning zone, means an Indigenous nation that is identified for the hazard planning zone in a manner specified by the regulator;
“qualified professional”, in relation to a matter, means an individual who
(a) is registered with a regulatory body as defined in section 1 (1) [definitions and interpretation] of the Professional Governance Act, and
(b) through suitable education, experience, accreditation and knowledge, may reasonably be relied on to provide advice within the individual's area of expertise as it relates to the matter;
“qualified professional of record”, in relation to a matter, means the qualified professional who has accepted professional responsibility for the matter;
“safety critical devices”, means equipment, instrumentation, controls or systems at a hydrogen facility
(a) that, on malfunction, would cause or contribute substantially to the release of hazardous material or energy, or
(b) that must operate properly to mitigate the adverse effects of a release of hazardous material or energy.
(2) For the purposes of this regulation, a hazard planning distance, in relation to a hazard at a hydrogen facility, is the greater of the following horizontal distances measured from the facility:
(a) a distance recommended for the hazard in an assessment conducted by a qualified professional;
(b) a distance determined for the hazard using a table, software application or other resource evaluated and approved by a qualified professional.
Read the Hydrogen Facility Regulation on BC Laws ↗