Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Schedule G
Schedule G — Maximum Administrative Penalties
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, Schedule G · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
Schedule G — Maximum Administrative Penalties
[en. B.C. Reg. 103/2005, s. 12.]
(Section 55) Item Column 1
Enactment Column 2
Description Column 3
Penalty 1 16 (2) Did not prepare a site level plan where required $5 000 2 18 Did not prepare a site level plan where required $5 000 3 19 (1) Did not ensure that a site level plan met the specified requirements $5 000 4 19 (2) Did not ensure that a site level plan met the specified requirements $5 000 5 20 (4) Did not notify the district manager as required $5 000 6 20 (5) Did not comply with a request to forward assessments to resource agencies $2 000 7 20 (6) Did not comply with specified review and comment requirements $2 000 8 20 (9) Carried out a forest practice contrary to section 20 (9) $10 000 9 21 Did not carry out a required archaeological impact assessment $5 000 10 22 (1) Did not prepare a site level plan where required $20 000 11 22 (2) Used a specified road for the purposes of timber harvesting and related purposes without having met the specified requirements $20 000 12 24 (2) Carried out harvesting under an authorization before specified appraisal data submitted $20 000 13 26 Did not comply with the requirements of any notice, authorization or condition specified by the district manager $20 000 14 28 (1) (a), (b), (c), (d), (f) or (g) Did not ensure that a forest practice met the prescribed requirements $50 000 15 28 (1) (e) Did not ensure that a forest practice met the prescribed requirements $100 000 16 28 (2) Did not take reasonable measures to mitigate any damage to the environment resulting from a contravention of section 28 (1) $100 000 17 29 (1) Did not ensure maintenance of the required amount of area in cutblocks in wildlife trees or wildlife tree patches $20 000 18 29 (2) Did not ensure maintenance of the required proportion of pre-harvesting coarse woody debris in cutblocks $20 000 19 30 (1) Exceeded the specified limit for the area that may be occupied by permanent access structures $50 000 20 30 (2) Did not deactivate permanent access structures where required $50 000 21 30.1 Exceeded the specified limit for the area that may be occupied by soil disturbance $50 000 22 31 (1) Did not ensure that roads provide for safe usage by the types and levels of traffic for which the road was intended $2 000 23 31 (2) Did not maintain a specified road until the deactivation of the road or the notification referred to in section 31 (2) $50 000 24 32 (3) Did not reforest specified areas in accordance with the specified requirements $100 000 25 32 (8) Did not carry out silviculture regimes that are designed to achieve the specified target stocking requirements $5 000 26 33 Did not ensure the destruction of insect broods within the specified time when using trap trees or pheromones to concentrate insect populations $5 000 27 34 Did not prepare a sustainable forest management prescription during the prescribed period $10 000 28 42 (3) (a) Did not achieve targets specified in a sustainable forest management plan within the applicable range of variance specified in the plan. $50 000 29 42 (3) (b) Did not carry out forest operations in a manner that is consistent with any applicable landscape level strategies specified in the plan. $5 000 30 42 (3) (c) Did not ensure that the stocking in coniferous areas conforms to any applicable mean stocked quadrant value specified in the plan. $100 000 31 42 (3) (d) Did not ensure that the retention of wildlife trees conforms to any applicable wildlife tree retention requirements specified in the plan. $20 000 32 42 (3) (e) Did not ensure that the retention of coarse woody debris conforms to any applicable coarse woody debris retention requirements specified in the plan. $20 000 33 42 (4) (a) Did not ensure that the operations are consistent with targets specified in a sustainable forest management plan within the applicable range of variance specified in the plan. $20 000 34 42 (4) (b) Did not ensure that the operations are consistent with any applicable landscape level strategies specified in the plan. $20 000 35 42 (4) (c) Did not ensure that the operations are consistent with the reforestation requirements described in section 32 and Schedule F. $50 000 36 44 (1) Did not submit the required assessment and proposal within the specified time where a higher level plan has come into effect after the approval of a sustainable forest management plan $20 000 37 44 (3) Did not implement a proposal approved by the regional manager $20 000 38 46 (1) Did not establish and maintain a public advisory group $10 000 39 46 (2) (a) Did not confirm membership to the public advisory group as required $2 000 40 46 (2) (b) Did not publish a notice specifying the membership of the public advisory group as required $2 000 41 49 (1) Did not maintain records and plans as required $5 000 42 49 (2) Did not produce records and plans as required $5 000 43 50 (1) Did not submit to and pay for a periodic independent audit as required $10 000 44 51 (1) Did not submit an annual report as required $10 000 45 51 (2) Did not submit an annual report as required $10 000 46 51 (4) Did not provide a copy of the annual report to the district manager and the public advisory group as required $2 000 47 53 (3) Did not comply with the minister's request related to an evaluation of the pilot project $5 000 48 55 (3) Did not take the measures specified by the district manager to rehabilitate the area $50 000 49 55 (4) Did not take the measures specified by the district manager to rehabilitate the area $50 000 50 57 (1) Did not make copies of all plans and assessments available as required $10 000 51 57 (2) Did not make a copy of a proposed sustainable forest management plan available to the public as required $5 000 52 57 (3) Did not make the specified information available for review by the public $5 000 53 60 (5) Did not comply with a condition imposed by the minister $10 000
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.