Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Section 9
Pre-existing silviculture prescriptions
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 9 · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
(1) A silviculture prescription must be treated under this regulation as a site level plan referred to in section 16 if the silviculture prescription was
(a) approved by the district manager under section 41 of the Act, or
(b) given effect by the district manager under section 40 of the Act.
(2) Subject to subsection (3), a participant must comply with Part 3 Division 5 when carrying out operations on the area of a site level plan referred to in subsection (1).
(3) In respect of a site level plan referred to in subsection (1), if
(a) the site level plan contains a performance requirement for
(i) a proportion of the cutblock area that may be occupied by permanent access structures that is higher than the proportion specified in section 30 (1),
(ii) a reforestation period that is longer than specified in section 32 (4),
(iii) a stocking requirement that is lower than those specified in section 32 (5), or
(iv) an attribute of a well-growing crop tree that is less restrictive than that specified in section 32 (6), and
(b) the commencement date under section 70 of the Act did not occur before November 15, 2001,
then the applicable performance requirement under this regulation for the area is that higher proportion, longer period, lower stocking requirement or less restrictive attribute, as the case may be.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.