Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001

Section 89

Definition

Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 89 · last amended April 1, 2024 · read from BC Laws on November 17, 2026

The text

In this Schedule “active flood plain” means the level area with alluvial soils adjacent to streams that is flooded by stream water on a periodic basis and is at the same elevation as areas showing evidence of (a) flood channels free of terrestrial vegetation, (b) recently rafted debris or fluvial sediments newly deposited on the surface of the forest floor or suspended on trees or vegetation, or (c) recent scarring of trees by material moved by flood waters.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.