Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001

Section 83

Notice

Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 83 · last amended April 1, 2024 · read from BC Laws on November 17, 2026

The text

(1) Before a participant submits a forest operations schedule or amendment, the participant must publish a notice, in a form acceptable to the district manager, in a newspaper stating that the forest operations schedule is available for public review and comment. (2) Despite subsection (1), notice is not required under that subsection if the district manager determines (a) that the forest operations schedule or amendment otherwise complies with this Schedule and is necessary to enable measures to be taken to address an emergency, and (b) that there is insufficient time to provide for review and comment for a period of at least 10 days. (3) Despite subsection (1), notice is not required under that subsection if the district manager determines that the amendment (a) otherwise complies with this Schedule, (b) will adequately provide for managing and conserving the forest resources of British Columbia for the area to which it applies, and (c) does not materially change the objectives or results of the schedule. (4) Despite subsection (1), notice is not required under that subsection if the amendment increases the size of a cutblock provided that (a) the amount of the increase does not exceed (i) 1 ha or 25% of the area of the cutblock, whichever is greater, if the cutblock is less than 20 ha before the increase, or (ii) 10 ha or 25% of the area of the cutblock, whichever is less, if the cutblock is at least 20 ha before the increase, (b) the cutblock size remains consistent with the sustainable forest management plan, and (c) none of the area being added to the cutblock as a result of the proposed amendment will result in harvesting within (i) a riparian management zone of a stream that has a classification of S1, S2, S3 or S4, (ii) a known forest ecosystem network, (iii) a wildlife tree patch, (iv) a known old growth management area, or (v) a known ungulate winter range. (5) Despite subsection (1), notice is not required under that subsection if the district manager determines that it is not practicable to publish a notice, given the circumstances or conditions applicable to the area under an amendment.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.