Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Section 81
Map and information requirements for all forest operations schedules
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 81 · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
(1) A participant must ensure that a forest operations schedule includes the following information for the area affected by the proposed timber harvesting and road construction or modification operations:
(a) forest cover;
(b) the topography of the area, and the location of those streams, wetlands and lakes that are shown on forest cover maps or fish and fish habitat inventory maps or terrain resource inventory maps;
(c) the following known items:
(i) protected areas;
(ii) designated areas under Part 13 of the Forest Act;
(iii) wilderness areas;
(iv) established sensitive areas;
(v) wildlife habitat areas, except in a case to which subparagraph (vi) of this paragraph applies;
(vi) the name of any identified wildlife protected by wildlife habitat areas if the district manager or a designated environment official makes it known that the location of the wildlife habitat area is not to be included;
(vii) forest ecosystem networks;
(viii) old growth management areas;
(ix) scenic areas;
(x) ungulate winter ranges;
(xi) community water supply intakes and related water supply infrastructures;
(xii) fish streams;
(xiii) riparian class of streams, wetlands and lakes;
(d) the following public utilities on Crown land:
(i) transmission lines;
(ii) gas and oil pipelines;
(iii) railways;
(e) the approximate location of
(i) proposed construction of a road, including construction of a bridge or major culvert that is part of the road,
(ii) proposed replacement or addition of a bridge or major culvert,
(iii) proposed construction of a bridge or major culvert, and
(iv) proposed replacement or addition of a bridge or major culvert authorized under this regulation or under an agreement under the Forest Act,
and the year in which the work is proposed to take place if the timing is critical to the management of non-timber forest resources;
(f) for any proposed bridges, whether the bridge will be a temporary or permanent bridge;
(g) the following road deactivation operations that have been, or are to be conducted by the participant:
(i) roads that are currently deactivated to a temporary or semi-permanent level;
(ii) roads that are to be deactivated in the next 3 years and the year the work is proposed to take place if the timing is critical to the management of non-timber forest resources;
(iii) the level of deactivation of roads referred to in subparagraph (ii);
(iv) the types of vehicle usage, if any, that are proposed to be accommodated on the roads referred to in subparagraph (ii) after deactivation;
(h) the known location of temporary or permanent barriers to vehicle access;
(i) the approximate location of cutblocks proposed that are not the subject of an authorization under section 23;
(j) for each cutblock that is currently the subject of an authorization under section 23,
(i) the approximate location of the cutblock, and
(ii) if the areas within the cutblock are to be reforested as coniferous areas, deciduous areas or mixedwood areas.
(k) to (m) Repealed. [B.C. Reg. 103/2005, s. 10 (b).]
(2) Despite subsection (1), a participant is not required to include the information specified in that subsection for an area in a forest operations schedule in which only minor salvage operations will be carried out, unless the district manager, by written notice, requires some or all of that information, in which case the participant must comply with that notice.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.