Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001

Section 67

Map and information requirements for all forest development plans

Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 67 · last amended April 1, 2024 · read from BC Laws on November 17, 2026

The text

(1) A participant must ensure that a forest development plan includes the following information for the area under the plan: (a) forest cover; (b) the topography of the area, and the location of those streams, wetlands and lakes that are shown on forest cover maps or fish and fish habitat inventory maps or terrain resource inventory maps; (c) for terrain stability (i) one of the following: (A) areas mapped on terrain stability hazard maps as having a moderate or high likelihood of landslides; (B) if no terrain stability hazard mapping has been done, areas identified on reconnaissance terrain stability maps as having unstable or potentially unstable terrain; (C) if no terrain stability hazard mapping or reconnaissance terrain stability mapping has been carried out, areas with a slope gradient greater than 60%, and (ii) any areas identified by the district manager as having unstable or potentially unstable terrain; (d) if required by the district manager, the operability line; (e) the following known items: (i) protected areas; (ii) designated areas under Part 13 of the Forest Act; (iii) wilderness areas; (iv) sensitive areas established in accordance with the Act; (v) subject to subsection (3), wildlife habitat areas; (vi) forest ecosystem networks; (vii) old growth management areas; (viii) scenic areas; (ix) ungulate winter ranges; (x) community water supply intakes and related water supply infrastructures; (xi) fish streams; (xii) riparian class of streams, wetlands and lakes; (f) the following public utilities on Crown land: (i) transmission lines; (ii) gas and oil pipelines; (iii) railways; (g) the approximate location of (i) construction of a road, including construction of a bridge or major culvert that is part of the road, if the road is proposed to be authorized under this regulation, (ii) proposed replacement or addition of a bridge or major culvert, if the bridge or major culvert is part of a road authorized under this regulation, (iii) construction of a bridge or major culvert proposed to be authorized under this regulation or agreement under the Forest Act, and (iv) replacement or addition of a bridge or major culvert authorized under this regulation or agreement under the Forest Act, and the year the work is proposed to take place if the timing is critical to the management of non-timber forest resources; (h) the location of each road that has been included on the most recently approved forest development plan; (i) the forest operations for which road construction or modification is required, for operations other than harvesting; (j) for any proposed bridges, whether the bridge will be a temporary or permanent bridge; (k) with respect to an existing road that both provides access to the area and is required by the Act to be maintained by the participant, the following information: (i) its approximate location; (ii) whether it is intended to be for seasonal use only; (iii) a description or map of how it links up with a public road system, processing plant or log dump; (l) a list or map notation indicating the roads that must be maintained by the participant; (m) the following road deactivation operations that have been or are to be conducted by the participant on the area under the plan: (i) roads that were permanently deactivated during the previous year; (ii) roads that are currently deactivated to a temporary or semi-permanent level; (iii) roads that are to be deactivated and the year the work is proposed to take place if the timing is critical to the management of non-timber forest resources; (iv) the level of deactivation of roads referred to in subparagraph (iii); (v) the types of vehicle usage, if any, that are proposed to be accommodated on the roads referred to in subparagraph (iii) after deactivation; (n) the known location of roads that are proposed by other persons; (o) the known location of temporary or permanent barriers to vehicle access; (p) the approximate location of cutblocks proposed to achieve Category A status if the proposed forest development plan is approved; (q) for each Category A cutblock referred to in paragraph (p), specify for the purposes of section 35 and Schedule F if the cutblock is to be reforested as a coniferous area, a deciduous area or a mixedwood area; (r) the location of a cutblock that has been included as an approved Category A cutblock on the most recently approved forest development plan, and whether an authorization for the cutblock has been given under section 23; (s) the location of cutblocks that have been harvested, but are not yet greened-up and that are adjacent to cutblocks referred to in paragraph (p) or (r); (t) if significant risks to forest resources are recorded or disclosed by the forest health assessment, measures to reduce those risks that do not, themselves, cause new or significantly increased risks; (u) any applicable performance standards that are to apply for the purposes of Part 3 Division 5 and the associated Schedules; (v) the general objectives for riparian management zones, including the range of basal area retention by riparian class; (w) the known objectives for known ungulate winter ranges. (2) Despite subsection (1), a participant is not required to include the information specified in that subsection for an area in a forest development plan in which only minor salvage operations will be carried out, unless the district manager, by written notice, requires some or all of that information, in which case the participant must comply with the requirements in that notice. (3) The location of any of the wildlife habitat areas referred to in subsection (1) (e) (v) must not be shown if the district manager or designated environmental official makes it known that the location of the wildlife habitat area is not to be included, in which case only the name of the identified wildlife protected by the wildlife habitat area must be included.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.