Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Section 65
Maximum cutblock size
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 65 · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
(1) The maximum size of a cutblock must not exceed 60 ha.
(2) The maximum size for a cutblock specified under subsection (1) does not apply to a cutblock located in an area under a higher level plan if
(a) the higher level plan specifies that cutblocks may be larger, or
(b) the higher level plan specifies conditions precedent to approval of larger cutblock sizes and the district manager is satisfied that the conditions are met.
(3) Despite subsection (1), the district manager may
(a) refuse to approve a forest development plan that includes a cutblock that complies with that subsection if the district manager is of the opinion that a cutblock smaller than that specified in subsection (1) is required
(i) for hydrological reasons,
(ii) to manage wildlife values,
(iii) to manage recreation or scenic values, or
(iv) for other similar reasons, or
(b) approve a forest development plan that includes a cutblock that is larger than that specified in subsection (1) if one or more of the following apply:
(i) the harvesting is being carried out to recover timber that was damaged by fire, insects, wind or other similar events and, if possible, the cutblock incorporates structural characteristics of natural disturbance;
(ii) the silvicultural system proposed for the area
(A) is other than clearcut or seed tree, and
(B) retains 40% or more of the pre-harvest basal area;
(iii) the district manager is of the opinion that the larger cutblock is designed to be consistent with the structural characteristics and the temporal and spatial distribution of natural openings.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.