Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Section 30.1
Soil disturbance for specified site level plans
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 30.1 · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
A participant or holder of a minor timber sale licence who
(a) is the holder of a site level plan referred to in section 9 for an area for which subsection (3) of that section does not apply, and
(b) carries out a forest practice on the area
must not exceed the maximum amount of soil disturbance within the net area to be reforested that is specified in the site level plan for the area.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.