Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001

Section 20.2

Amendments to specified plans that do not require approval

Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 20.2 · last amended April 1, 2024 · read from BC Laws on November 17, 2026

The text

(1) Subject to section 20.3, an approval is not required to amend (a) a forest development plan, or (b) a site level plan referred to in section 9 that contains an applicable performance standard if the holder of the plan considers that (c) the proposed amendment does not materially change the intended results or strategies specified in the plan, or (d) the proposed amendment (i) will not increase the adverse impact on forest resources, and (ii) conforms to the circumstances specified in subsection (2). (2) The circumstances for the purposes of subsection (1) (d) (ii) are: (a) deletions of previously approved cutblocks or roads, provided that the implementation of the amendment will not deleteriously impact forest health on the area; (b) changes, as a result of a traverse that was more accurate than the traverse that was previously carried out on an area, in (i) the location of a cutblock or road, or (ii) the area of a cutblock after harvesting in the cutblock has been completed; (c) changes in the year or season of harvest or road building, provided that the timing is not critical to the management of non-timber forest resources; (d) changes in proposed roads, including temporary roads, provided that the changes maintain the general pattern and intent of proposed road development access; (e) increases in the size of a cutblock provided that (i) the amount of the increase does not exceed (A) 1 ha or 25%, whichever is greater, if the cutblock is less than 20 ha, or (B) 10 ha or 25%, whichever is less, if the cutblock is at least 20 ha, (ii) the cutblock size remains consistent with section 65, and (iii) none of the area being added to the cutblock as a result of the proposed amendment will result in harvesting within (A) a riparian management zone of a stream that has a classification of S1, S2, S3 or S4, (B) a known forest ecosystem network, (C) a wildlife tree patch, (D) a known old growth management area, or (E) a known ungulate winter range; (f) changes in the silvicultural system from a clearcut system to a partial cut system; (g) changes to harvesting systems from ground to aerial or cable. (3) A holder of a forest development plan or a site level plan that is amended under this section must provide a copy of the amendment to the district manager on request. (4) A holder of a forest development plan or a site level plan who makes an amendment under this section need not make the amendment available for (a) review, and (b) comment.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.