Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001
Section 19
Site level plan content
Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 19 · last amended April 1, 2024 · read from BC Laws on November 17, 2026
The text
(1) A participant must ensure that a site level plan referred to in section 16
(a) is signed and sealed by a professional forester,
(b) is consistent with
(i) any forest development plan in effect for the area at the time the site level plan is prepared, or
(ii) if there is no forest development plan in effect for the area,
(A) the sustainable forest management plan in effect at the time the site level plan is prepared, and
(B) the forest operations schedule that applies to the area,
(c) includes a map showing the location of
(i) the cutblock,
(ii) any resource features and mappable reserves in the cutblock, and
(iii) the approximate location of roads in the cutblock,
(d) includes the information the professional forester determines necessary for the professional forester to have reasonable grounds to believe that the participant will comply with Division 5 if forest practices are carried out in accordance with the site level plan, and
(e) is signed by the participant.
(2) A participant must ensure that a site level plan referred to in section 18
(a) is prepared by a qualified registered professional unless, with respect to a site level plan referred to in section 18 (b), the participant has determined that the area has a low likelihood of landslides,
(b) is consistent with
(i) any forest development plan in effect for the area at the time the site level plan is prepared, or
(ii) if there is no forest development plan in effect for the area,
(A) the sustainable forest management plan in effect at the time the site level plan is prepared, and
(B) the forest operations schedule that applies to the area,
(c) includes a map showing the approximate location of the road,
(d) includes the information the preparer determines necessary for the preparer to have reasonable grounds to believe that the participant will comply with Division 5 if the road is constructed or deactivated in accordance with the site level plan, and
(e) is signed by the participant.
(3) A participant may amend a site level plan and, if so, must ensure that the amendment
(a) complies with the relevant requirements of
(i) subsection (1), if it is an amendment to a site level plan referred to in section 16, or
(ii) subsection (2), if it is an amendment to a site level plan referred to in section 18, and
(b) is signed by the participant.
Read the Fort St. John Pilot Project Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.