Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001

Section 16

Site level plans required before timber harvesting or reforestation

Cite as Fort St. John Pilot Project Regulation, B.C. Reg. 278/2001, s. 16 · last amended April 1, 2024 · read from BC Laws on November 17, 2026

The text

(1) The timber sales manager must prepare a site level plan for the following areas of Crown land: (a) a cutblock, before the area is harvested under a minor timber sale licence; (b) an area in which the timber was cut, removed, damaged or destroyed in contravention of section 96 of the Act by a holder of a minor timber sale licence, as soon as is practicable after a determination has been made with respect to the contravention. (2) A participant who is the holder of an agreement under the Forest Act must prepare a site level plan for the following areas of Crown land: (a) a cutblock, before the participant harvests timber in the cutblock area; (b) an area in which the timber was either cut, removed, damaged or destroyed in contravention of section 96 of the Act by the participant, as soon as is practicable after a determination has been made with respect to the contravention; (c) and (d) Repealed. [B.C. Reg. 292/2003, Sch. D, s. 7 (a).] (3) The district manager may exempt a participant from (a) subsection (1) (a) or (2) (a) if the area to be harvested in the cutblock does not exceed 2 ha and is not adjacent to an area for which a previous exemption was granted, unless that area has become well-growing, or (b) subsection (1) (b) or (2) (b) if (i) the area in which the contravention occurred is less than 1 ha, and (ii) the district manager considers that a site level plan is not necessary to facilitate the adequate management and conservation of the forest resources on the area. (4) Repealed. [B.C. Reg. 292/2003, Sch. D, s. 7 (c).]
Read the Fort St. John Pilot Project Regulation on BC Laws ↗

Made under Forest and Range Practices Act, SBC 2002, c. 69.