Code of Practice for Industrial Non-Hazardous Waste Landfills Incidental to the Wood Processing Industry, B.C. Reg. 263/2010
Section 3
Registration requirements for all landfill facilities
Cite as Code of Practice for Industrial Non-Hazardous Waste Landfills Incidental to the Wood Processing Industry, B.C. Reg. 263/2010, s. 3 · last amended February 18, 2022 · read from BC Laws on November 17, 2026
The text
(1) A person must register under section 4 of the Waste Discharge Regulation for the purposes of an exemption under that section in relation to this code and must provide, with the other information required under section 4 (2) of that regulation, the following information:
(a) the source and composition of the solid waste discharged or proposed to be discharged to the landfill;
(b) the total capacity or designed total capacity of the landfill;
(c) the maximum volume of solid waste, in cubic metres per year, discharged or to be discharged to the landfill;
(d) the address of the location where the landfill facility records referred to in section 18 will be kept;
(e) subject to subsection (3), confirmation that the appropriate local government has been notified of the landfill facility at least 30 days before the date on which the registration is provided to a director under section 4 (3) of the Waste Discharge Regulation;
(f) confirmation that a conceptual closure plan that complies with subsection (2) has been prepared for the landfill facility.
(2) The conceptual closure plan must
(a) specify the final design elevations of the landfill,
(b) specify the maximum volume and area of the landfill at the time of closure,
(c) include the design of the final slope of the landfill and identify
(i) the vegetation cover, and
(ii) the inert cover material proposed for the landfill,
(d) identify the measures to be taken to prevent, or minimize the risk of, any of the following occurring after the closure of the landfill facility:
(i) an escape of leachate or waste from the landfill;
(ii) erosion of the landfill cover;
(iii) fire at the landfill facility;
(iv) water running onto the landfill facility,
(e) identify maximum periods following the final discharge of waste before the implementation of the plan is initiated, and
(f) include a site plan.
(3) Confirmation is not required under subsection (1) (e) if
(a) the registration relates to a landfill facility for which a permit has been issued before the date on which this section came into force, and
(b) the permit remains in force until the registration becomes effective.
(4) In this section, “appropriate local government” means the local government for the area within which the landfill facility will be located.
Read the Code of Practice for Industrial Non-Hazardous Waste Landfills Incidental to the Wood Processing Industry on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.