Oil and Gas Waste Regulation, B.C. Reg. 254/2005

Section 7

Requirements for discharges from specific operations

Cite as Oil and Gas Waste Regulation, B.C. Reg. 254/2005, s. 7 · last amended July 8, 2024 · read from BC Laws on November 17, 2026

The text

(1) Despite sections 3 to 14, 18, 19 and 37 of the Hazardous Waste Regulation and subject to section 8 of this regulation, the operators of equipment or facilities are authorized to discharge produced water or recovered fluids from a well completion or workover to an underground formation in accordance with the Energy Resource Activities Act. (2) Subject to subsection (3) and section 8 of this regulation, the operators of equipment or facilities are authorized to discharge to land the following wastes: (a) waste drilling muds, and drill cuttings generated by drilling operations that use water-based drilling muds (i) discharged to or from drilling rig sites, or (ii) discharged from directional drilling operations for pipelines associated with transporting oil or natural gas or produced water, if (iii) any drilling sump is constructed and is subsequently decommissioned in accordance with the "British Columbia Oil and Gas Handbook" issued by the Oil and Gas Commission, as amended from time to time, (iv) the drilling wastes are managed in accordance with the "British Columbia Oil and Gas Handbook" issued by the Oil and Gas Commission, as amended from time to time, and (v) the requirements of a delegation under Section 26 of the Agricultural Land Commission Act, are complied with for any land in the Agricultural Land Reserve onto which the discharge is to be made; (b) drill cuttings generated by drilling operations that use non-aqueous drilling mud, such as oil-based or synthetic-based muds, if (i) prior written notification of any proposed discharge is provided to a director and the discharge is carried out in accordance with the director's requirements, and (ii) the requirements of a delegation under section 26 of the Agricultural Land Commission Act are complied with for any land in the Agricultural Land Reserve onto which the discharge is to be made; (c) well completion or workover solids if the completion or workover solids are managed in accordance with the requirements in the "British Columbia Oil and Gas Handbook" issued by the Oil and Gas Commission, as amended from time to time; (d) waste cement that flows back from a well bore as part of an operation to place cement in a well bore or annulus, if the waste cement is managed in accordance with the requirements in the "British Columbia Oil and Gas Handbook" issued by the Oil and Gas Commission, as amended from time to time; (e) water used in hydrostatic pipeline testing, accumulated precipitation in flare pits and surface runoff from sites associated with equipment and facilities identified in sections 4 and 6, if (i) the liquid is not allowed to enter a surface watercourse or surface water body and is not discharged in a location where it could reasonably be expected to enter a surface watercourse or surface water body, (ii) the liquid quality does not exceed the values for the following discharge parameters: (A) for water used in hydrostatic pipeline testing and surface runoff from sites associated with equipment and facilities identified in sections 4 and 6: Parameters Values Chlorides (as Cl) 500 mg/L Hydrocarbons no visible sheen Electrical Conductivity 2 dS/m (B) for accumulated precipitation in flare pits: Parameters Values Chlorides (as Cl) 500 mg/L The sum of • Volatile Hydrocarbons in Water by GC/FID and • Extractable Petroleum Hydrocarbons (EPH) in Water by GC/FID 15 mg/L Electrical Conductivity 2 dS/m (iii) the pH of the liquid is between 6.5 and 8.5 or some other value accepted by a director, (iv) if the liquid is water used for hydrostatic pipeline testing and methanol, ethylene glycol or other additives have been added, then the liquid discharged must exhibit an EC (50)15 of 75% or greater as measured by Microtox® Photobacteria Bioassay or an equivalent value determined by another bioassay method approved by a director, (v) the liquid is discharged at a rate at which there is no accumulation of effluent on the surface of the ground, (vi) the discharge does not cause erosion or result in measurable downward and outward movement of soil, rocks, snow, ice, mud or debris, and (vii) the discharge is on to a stable slope. (3) The operators who are authorized to discharge the wastes referred to in subsection (2) (e) must (i) obtain written consent of the land owner for any discharges of waste to private land, (ii) analyse the discharge for the parameters listed in subsections (2) (e) (ii), (iii) and (iv) before each discharge and record that analysis, (iii) record the volume of discharge after each discharge, (iv) retain, for a period of 5 years, all records specified in subparagraphs (ii) and (iii), and (v) make those records available for inspection by an officer. (4) The operators of pigs and pig receivers must collect and contain all liquid effluent and solid wastes produced during pipeline pigging. (5) Despite sections 3 to 14, 18, 19 and 37 of the Hazardous Waste Regulation, operators of equipment or facilities may discharge from the equipment or facility acid gas by means of underground injection provided that the discharge is approved by the Oil and Gas Commission under the Energy Resource Activities Act.
Read the Oil and Gas Waste Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.