Coal Act Regulation, B.C. Reg. 251/2004
Section 3
Submissions under sections 8, 13 and 18 of the Act
Cite as Coal Act Regulation, B.C. Reg. 251/2004, s. 3 · last amended July 17, 2026 · read from BC Laws on November 17, 2026
The text
(1) A person referred to in sections 8, 13 and 18 of the Act must submit to the minister by the due date referred to in this section information and data in the form and manner approved by the minister and sufficient for consideration of the submission by the minister for the purposes of the relevant section of the Act.
(2) For the purposes of subsection (1), the information and data must
(a) clearly document, at suitable scales, the specific type, amount, date and location of all original exploration and development conducted on coal exploration lands in relation to the boundaries of the location, and submit the results of the exploration and development in the form of text, maps, diagrams, logs, cross-sections, tables and spreadsheets necessary to describe, illustrate, explain and interpret the exploration and development,
(b) include a statement of costs and, if requested by the minister, receipts for those costs,
(c) include, as appropriate, written descriptions of the materials, media and coal horizons mapped or sampled including interpretation of field observations and post-survey data processing,
(d) for all drilling activity, trenches, pits and adits, include
(i) a surface location or geological and sampling map of all sites,
(ii) a comprehensive log of each hole, trench, pit or adit and all associated data,
(iii) collar and down-hole surveys, lithological, stratigraphic, structural, geophysical or digital photographic logs, and
(iv) complete analytical and testing results of all samples, core and cuttings keyed to the logs, and
(e) provide an estimate of coal reserves and resources that conforms with the standards set by National Instrument 43-101.
(3) Except when required under section 8 (2) of the Act as a result of an expiry, a surrender or a cancellation of a licence or lease, the information and data required under subsections (1) and (2) of this section must be submitted to the minister as follows:
(a) for a licence extension, with the application or on another date allowed by the minister under section 13 (4) of the Act;
(b) for a lease, on or before the anniversary date of the lease in each year;
(c) for a person exploring for or developing coal on freehold land, on or before March 31 in each year.
Read the Coal Act Regulation on BC Laws ↗
Made under Coal Act, SBC 2004, c. 15.