Renewable Energy Projects (Streamlined Permitting) Act, SBC 2025, c. 12

Section 1

Definitions

Cite as Renewable Energy Projects (Streamlined Permitting) Act, SBC 2025, c. 12, s. 1 · read from BC Laws on November 17, 2026

The text

(1) In this Act: “board” has the same meaning as in section 1 (2) of the primary Act; “Crown land” means land, whether or not it is covered by water, that is vested in the government; “delegated instrument” means an instrument issued in exercise of a power or performance of a duty referred to in section 9.1 [delegations and designations under other enactments] of the primary Act; “electric transmission line project” means a project to construct or operate electric transmission lines or related facilities; “level 1 streamlined project” means a streamlined project to which Division 1 [Level 1 Streamlining] of Part 2 applies; “level 2 streamlined project” means a streamlined project to which Division 2 [Level 2 Streamlining] of Part 2 applies; “level 3 streamlined project” means a streamlined project to which Division 3 [Level 3 Streamlining] of Part 2 applies; “North Coast Transmission Line project” means the electric transmission line project (a) to upgrade and operate existing electric transmission lines, and related facilities, from around Prince George to around Terrace, and (b) to construct and operate new electric transmission lines, and related facilities, from around Prince George to around Terrace; “primary Act” means the Energy Resource Activities Act; “regulator” has the same meaning as in section 1 (2) of the primary Act; “renewable energy” means energy derived from a renewable resource; “renewable energy activity” means the construction or operation of (a) a facility for the generation or storage of renewable energy, or (b) an electric transmission line or related facilities; “renewable energy facility” means a facility referred to in paragraph (a) or (b) of the definition of "renewable energy activity"; “renewable energy project” means a project to carry out renewable energy activities and other activities that are required for or facilitate those renewable energy activities; “renewable resource” means biomass, biogas, geothermal heat, hydro, solar, ocean, wind or a prescribed resource; “selected wind energy projects” means the 9 wind energy projects that were selected by the British Columbia Hydro and Power Authority through its 2024 call for power; “streamlined project” has the meaning given to it in section 2. (2) For certainty, paragraph (b) of the definition of "renewable energy activity" in subsection (1) does not imply that construction or operation of an electric transmission line might not be a related activity within the meaning of the primary Act.
Read the Renewable Energy Projects (Streamlined Permitting) Act on BC Laws ↗