Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015

Section 41.8

Application for designation as new entrant

Cite as Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015, s. 41.8 · last amended April 1, 2026 · read from BC Laws on November 17, 2026

The text

(1)-(2) Repealed. [B.C. Reg. 47/2026, App. 1, s. 9 (a).] (3) An application for designation as a new entrant of all or part of an industrial operation must be made (a) on or after the authorization date of the operation or the part of the operation, and (b) on or before May 31 of the compliance period in which the first compliance report of the operation or the part of the operation is due if the designation is made. (4) An application for designation as a new entrant of all or part of an industrial operation must be in the form and manner specified by the director and include the following: (a) a statement signed and dated by a senior officer of the operator of the operation requesting the designation and attesting to the truth of the information provided in the application; (b) a statement specifying whether the operation is forecasted to have emissions attributable under section 3 exceeding 100 000 tonnes of carbon dioxide equivalent per year; (c) the date the application is submitted; (d) the information referred to in section 11.3 (2) (a) to (k) [registration requirements — reporting operations and potential reporting operations] in relation to the operator and the operation, as applicable; (e) the legal name, job title and position and business contact information, including mailing address, email address and telephone number, of the person primarily responsible for preparing and submitting the application; (f) an assertion that the operation is a reporting operation; (g) if the application is for all of an operation with a date of first shipment on or after April 1, 2024 requesting a new entrant period beginning before the date of first shipment, (i) assertions that (A) the date of first shipment has not occurred, and (B) the authorization date has occurred, (ii) confirmation that the operator wishes the operation to become a regulated operation with a new entrant period beginning on the date of receipt of the application, and (iii) a description of (A) the authorizations, including permits and approvals, required under an enactment or a municipal or regional district bylaw after completion of construction of the operation in order for the operation to begin operations, or (B) if no authorizations referred to in clause (A) are required, the operations that have begun; (h) an assertion as to the date of first shipment, if the application is for either of the following: (i) all of an operation with a date of first shipment on or before March 31, 2024 the application for which is submitted after the date of first shipment; (ii) all of an operation with a date of first shipment on or after April 1, 2024 the application for which (A) is submitted after the date of first shipment, and (B) requests a new entrant period beginning on the date of first shipment; (h.1) if the application is for a part of an operation, (i) a description of the part of the operation, (ii) an assertion as to the date of first commercial production, and (iii) a description of how the operator will distinguish between the operation and the part of the operation when reporting under sections 3 and 7 of the Act; (i) any other information required by the director. (5) An application for designation as a new entrant of a proposed industrial operation must be made before the operation becomes a reporting operation. (6) An application for designation as a new entrant of a proposed industrial operation must be in the form and manner specified by the director and include the following: (a) the information referred to in subsection (4) (a) to (e) and (i); (b) an assertion that the operation will meet the criteria set out in section 41.9 (1) before the operation's new entrant period begins; (c) the date, if any, that the operation requests for its designation as a new entrant to begin, which date must be (i) on or after the operation's authorization date, and (ii) before the operation's date of first shipment.
Read the Greenhouse Gas Emission Reporting Regulation on BC Laws ↗

Made under Greenhouse Gas Industrial Reporting and Control Act, SBC 2014, c. 29.