Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015

Section 30

Verification of emission reports

Cite as Greenhouse Gas Emission Reporting Regulation, B.C. Reg. 249/2015, s. 30 · last amended April 1, 2026 · read from BC Laws on November 17, 2026

The text

(0.1) In this section, “site visit” means a site visit required under subsection (2) (d). (1) The verification process used to prepare a verification statement for an emission report of a reporting operation to which this Division applies must comply with the requirements of subsection (2), ISO 14064-3 and IAF MD4. (1.1) Despite section 2 [effect of amendments], the verification process described in subsection (1) is not required to comply with amendments to ISO 14064-3 until required to do so by the member of the International Accreditation Forum that accredited the verification body conducting the verification process. (2) A verification process referred to in subsection (1) must include the following: (a) a review by the verification body of records relevant to the verification of information included in the emission report, including, but not limited to, (i) inventory and stock records, (ii) sales and purchase records, (iii) onsite and offsite delivery records, (iv) input purchase and delivery records, (v) fuel measurement records, (vi) equipment rated capacity, power, run time and load factor records, as applicable, and (vii) any other information that provides financial or direct measurement information about the emissions, product and energy data reported; (b) an assessment by the verification body of the sources and magnitude of potential errors, omissions and misstatements for the purposes of designing an appropriate verification plan; (c) preparation of a verification plan by the verification body, including an evidence gathering plan; (d) one or more site visits, as described in subsection (3), conducted by the verification body; (d.1) the procedures by the verification body that, in the professional judgment of the verification body, are required in the verification process, including, but not limited to, (i) conducting interviews with relevant operation and facility personnel, including those responsible for preparation and accounting of emissions, product and energy data, (ii) making direct observations, in person or virtually, of equipment and elements of the facility and operation that are material for the verification process, (iii) reviewing relevant financial transactions necessary to confirm the complete and accurate reporting of emissions, product, and energy data, and (iv) conducting an appropriate number of data checks in accordance with an evidence-gathering plan that (A) identifies each facility in the reporting operation that has emissions attributable under section 3 for the reporting period, (B) focuses on the largest and most uncertain estimates of emission and energy data, (C) ensures the accuracy of calculations and allocations of emission and energy data, (D) enables the verification body to conclude with a reasonable level of assurance whether the emission report is free of material errors, omissions, or misrepresentations, (E) reviews meter and analytical instrumentation measurement accuracy and calibration for consistency with manufacturer's specifications, and (F) identifies and assesses the validity of any data substitutions in accordance with the directions of the director, or, if there are no directions, with best industry practice; (e) application by the verification body of verification procedures at a reasonable level of assurance; (f) an evaluation by the verification body of whether the emission report was prepared and the emissions reported in it quantified in accordance with the requirements of this regulation; (g) an assessment by the verification body of the materiality of any errors, omissions or misstatements identified; (h) an assessment by the verification body of (i) whether any data substitutions used in quantifying information in the emission report have been prepared in accordance with the requirements of section 15 (2) [methodologies for quantifying emissions], or, if no requirements are specified, whether any data substitutions used in quantifying information in the emission report have been prepared in accordance with best industry practice, and (ii) whether the operator corrected any errors identified in the verification process that can be corrected within a reasonable time and reasonable effort. (3) A site visit must be conducted as follows: (a) subject to subsections (4) to (6), a site visit must be conducted (i) in person, or (ii) virtually; (b) for a single facility operation, a site visit must be made to the facility; (c) for a linear facilities operation, (i) for an operation that is not a regulated operation, at least one site visit must be made to each individual facility within the operation where emissions attributable under section 3 from the facility are greater than or equal to 25 000 tonnes of carbon dioxide equivalent, and (ii) additional site visits must be made to sources within the operation if necessary to provide a reasonable level of assurance that the emission report is materially correct; (d) for single facility operations and linear facilities operations, at least one site visit must be made to the head office, regional office or other location of central data management, if different from the facilities visited under paragraph (b) or (c); (e) for an electricity import operation, a site visit must be made to the primary operations centre if necessary to provide a reasonable level of assurance that the emission report is materially correct. (4) A site visit may be conducted virtually only if all of the following apply: (a) all site visits by the verification body to the reporting operation for one of the 2 immediately preceding reporting periods were conducted in person; (b) the verification body determines that, since the most recent site visit to the reporting operation, (i) there have been no significant changes to processes or activities carried out at a facility that is all or part of the operation, and (ii) there have been no significant physical changes to a facility that is all or part of the operation; (c) the verification body determines that the process flow diagram required by section 11.3 (2) (m), if applicable, is accurate and reliable for the purposes of the verification. (5) A site visit may not be carried out virtually if the verification body determines that an in person site visit is necessary to provide a reasonable level of assurance that the emission report is materially correct. (6) The director may require that a site visit be conducted in person if the director considers that (a) an emission report previously submitted by the reporting operation was not prepared in accordance with this regulation, (b) emissions reported in an emission report previously submitted by the reporting operation were not quantified in accordance with this regulation, (c) a verification previously performed by the verification body did not comply with (i) this regulation, or (ii) the standards of the member of the International Accreditation Forum that accredited the verification body, or (d) it is otherwise necessary for the site visit to be conducted in person.
Read the Greenhouse Gas Emission Reporting Regulation on BC Laws ↗

Made under Greenhouse Gas Industrial Reporting and Control Act, SBC 2014, c. 29.