Special Direction No. 10 to the British Columbia Utilities Commission, B.C. Reg. 245/2007

Section 6

Interim planning criteria

Cite as Special Direction No. 10 to the British Columbia Utilities Commission, B.C. Reg. 245/2007, s. 6 · last amended February 3, 2012 · read from BC Laws on November 17, 2026

The text

(1) In deciding whether to issue a certificate to the authority under section 46 of the Act for the Ruskin Dam and Powerhouse Upgrade Project, the commission must assume that the authority requires, in order to meet its electricity supply obligations, the 334 gigawatt hours per year of firm energy and 114 megawatts of dependable capacity that the project is capable of delivering by 2018 and continuing to deliver over the expected life of the project. (2) In deciding whether to issue a certificate to the authority under section 46 of the Act for the John Hart Generating Station Replacement Project, the commission must assume that the authority requires, in order to meet its electricity supply obligations, the 806 gigawatt hours per year of firm energy and 128 megawatts of dependable capacity that the project is capable of delivering by 2018 and continuing to deliver over the expected life of the project. (3) In determining under section 71 of the Act whether the authority's energy supply contract in respect of the Conifex Mackenzie Power Project is in the public interest, the commission must assume that the authority requires, by 2013, in order to meet its electricity supply obligations, the 200 gigawatt hours per year of firm energy that would be provided under the contract. (4) In considering under section 44.2 (3) of the Act whether to accept or reject all or part of the authority's expenditure schedule relating to proposed expenditures on demand-side measures for the authority's 2012 and 2013 fiscal years, the commission, despite sections 44.2 (3) (a) and (5.1) of the Act, must accept an expenditure respecting a demand-side measure if (a) the demand-side measure is cost-effective in accordance with the Demand-Side Measures Regulation, and (b) the expenditure has not been shown to the satisfaction of the commission to be unreasonable for achieving the reductions in demand attributable to the demand-side measure. (5) In setting rates for the authority, the commission must ensure that those rates allow the authority to collect sufficient revenue in each fiscal year to enable the authority to recover costs incurred in carrying out demand-side measures accepted under subsection (4).
Read the Special Direction No. 10 to the British Columbia Utilities Commission on BC Laws ↗

Made under Utilities Commission Act, RSBC 1996, c. 473.