Special Direction No. 10 to the British Columbia Utilities Commission, B.C. Reg. 245/2007

Section 1

Definitions and interpretation

Cite as Special Direction No. 10 to the British Columbia Utilities Commission, B.C. Reg. 245/2007, s. 1 · last amended February 3, 2012 · read from BC Laws on November 17, 2026

The text

(1) In this Special Direction: “Act” means the Utilities Commission Act; “assets” means the generation and storage assets set out in the Schedule to the BC Hydro Public Power Legacy and Heritage Contract Act; “average water conditions” means the average stream flows occurring within the authority's historical record; “biomass contract” means an energy supply contract entered into by the authority and a proponent of a project selected by the authority as a result of the call for power; “call for power” means the process to acquire electricity solely from wood biomass being conducted by the authority on the date this Special Direction comes into force; “electricity supply obligations” means (a) electricity supply obligations for which rates are filed with the commission under section 61 of the Act, and (b) any other electricity supply obligations that exist at the time this Special Direction comes into force determined by using the authority's mid-level forecasts of its energy requirements and peak load, taking into account demand-side management initiatives, that are accepted by the commission from time to time; “firm energy capability” means the maximum amount of annual energy that a hydroelectric system can produce under average water conditions; “integrated area” means the geographic areas in the Province, other than the non-integrated areas, in which the authority serves customers under its schedules of rates filed with the commission from time to time; “non-integrated area” means Anahim Lake, Atlin, Bella Bella, Bella Coola, Dease Lake, Eddontenajon, Haida Gwaii and Telegraph Creek District; “wood biomass” means (a) wood residue within the meaning of the Forest Act, (b) wood debris from logging, construction or demolition operations, (c) organic residues from pulp and paper production processes, and (d) timber, within the meaning of the Forest Act, infested by the mountain pine beetle. (2) The definition of "firm energy capability" in subsection (1) must be interpreted for the purposes of this Special Direction so as to be consistent with the fact that, in 2011, the authority's firm energy capability was 48 200 gigawatt hours.
Read the Special Direction No. 10 to the British Columbia Utilities Commission on BC Laws ↗

Made under Utilities Commission Act, RSBC 1996, c. 473.