Timber Harvesting Contract and Subcontract Regulation, B.C. Reg. 22/96
Section 33.7
Damages
Cite as Timber Harvesting Contract and Subcontract Regulation, B.C. Reg. 22/96, s. 33.7 · last amended March 30, 2022 · read from BC Laws on November 17, 2026
The text
(1) If an impacted contractor is entitled to receive damages from a licence holder under either section 33.5 or 33.51, the amount of damages payable by the licence holder must equal X − Y where X is the damages that the conciliator determines would be payable based on a wrongful termination of a replaceable contract with an amount of work equal to the difference between (i) the amount of work each year that would be available to that contractor based on a proportionate reduction, and (ii) the amount of work each year as proposed for that contractor in the forestry revitalization proposal, which determination is to be made without reference to any requirement by the contractor to mitigate the loss associated with that difference whether under the Forestry Revitalization Trust or otherwise, and Y is the amount of mitigation funds that a contractor will receive under the Forestry Revitalization Trust based on a reduction in amount of work equivalent to the difference between (i) the amount of work each year that would be available to that contractor based on a proportionate reduction, and (ii) the amount of work each year as proposed for that contractor in the forestry revitalization plan.
(2) Except as provided in subsection (1), a licence holder is not liable to a contractor or subcontractor for any damages or other remedy arising directly or indirectly from a reduction in the amount of work in, or termination of, a replaceable contract, that takes place as a result of this Division.
(3) A contractor is not liable to a subcontractor for any damages or other remedy arising directly or indirectly from a reduction in the amount of work in, or termination of, a replaceable contract, that takes place as a result of this Division.
(4) A contractor or subcontractor, within 90 days of receiving notice that the amount of work under the contract or subcontract has been reduced under this Division, may terminate a replaceable contract or subcontract, by written notice to the licence holder or contractor, without incurring any liability to the other party.
Read the Timber Harvesting Contract and Subcontract Regulation on BC Laws ↗
Made under Forest Act, RSBC 1996, c. 157.