Woodlot Licence Planning and Practices Regulation, B.C. Reg. 21/2004
Section 40
Restrictions in a riparian management zone
Cite as Woodlot Licence Planning and Practices Regulation, B.C. Reg. 21/2004, s. 40 · last amended October 27, 2025 · read from BC Laws on November 17, 2026
The text
(1) A woodlot licence holder must not construct a road in a riparian management zone in a cutblock, unless one of the following applies:
(a) the construction of the road is provided for in the woodlot licence plan;
(b) locating the road outside the riparian management zone would create a higher risk of sediment delivery to the stream, wetland or lake to which the riparian management zone applies;
(c) there is no other practicable option for locating the road;
(d) the road is required as part of a stream crossing.
(2) Unless exempted under section 78 (1) [minister may grant exemptions], if a road is constructed within a riparian management zone, a woodlot licence holder must not carry out road maintenance activities beyond the clearing width of the road, except as necessary to maintain a stream crossing.
(3) Unless exempted under section 78 (1), a woodlot licence holder who constructs, maintains or deactivates a road must not remove gravel or other fill from within a riparian management zone, unless
(a) the gravel or fill is within a road prism,
(b) the gravel or fill is at a stream crossing, or
(c) there is no other practicable option.
(4) Unless exempted under section 78 (1), a woodlot licence holder who cuts, modifies or removes trees within a riparian management zone for an S4, S5 or S6 stream that has trees that contribute significantly to the maintenance of stream bank or channel stability, must retain enough trees adjacent to the stream to maintain the stream bank or channel stability, if the stream
(a) is a direct tributary to an S1, S2 or S3 stream,
(b) flows directly into the ocean, at a point near to or where one or more of the following is located:
(i) a herring spawning area;
(ii) a shellfish bed;
(iii) a saltwater marsh area;
(iv) an aquaculture site;
(v) a juvenile salmonid rearing area or an adult salmon holding area, or
(c) flows directly into the ocean at a point near to the location of an area referred to in paragraph (b) and failure to maintain stream bank or channel stability will have a material adverse impact on that area.
(5) Unless exempted under section 78 (1) [minister may grant exemptions], a woodlot licence holder must cut, modify or remove trees within a riparian management zone only as described in section 8 (3) [mapping and information].
Read the Woodlot Licence Planning and Practices Regulation on BC Laws ↗
Made under Forest and Range Practices Act, SBC 2002, c. 69.