Railway, Pipeline, Electric Power and Telecommunications Corporation Rights of Way Valuation Regulation, B.C. Reg. 218/86

Section 3

Determination of value

Cite as Railway, Pipeline, Electric Power and Telecommunications Corporation Rights of Way Valuation Regulation, B.C. Reg. 218/86, s. 3 · last amended December 17, 2025 · read from BC Laws on November 17, 2026

The text

The actual value of the right of way for an item in column 1 of the table must be determined using the rate set out opposite the item in column 2: Table Column 1 Column 2 For the track in place of a railway corporation, located on land a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, B.C. Reg. 51/2016, andb) south of the 59th parallel $26 630 per acre For the track in place of a railway corporation, located on land a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, andb) north of the 59th parallel $1 520 per acre For the track in place of a railway corporation, located on land described in section 2 (1) (c) (iii) of the Railway Corporations Assessment Regulation $1 350 per acre For the pipelines of a pipeline corporation, other than gathering pipelines $8 430 per acre For the gathering pipelines of a pipeline corporation $1 250 per acre For the transmission lines of an electrical power corporation $8 430 per acre For the metallic or fibre optic cables of a telecommunications corporation $8 430 per acre
Read the Railway, Pipeline, Electric Power and Telecommunications Corporation Rights of Way Valuation Regulation on BC Laws ↗

Made under Assessment Act, RSBC 1996, c. 20.