Solid Fuel Burning Domestic Appliance Regulation, B.C. Reg. 218/2016

Section 7

Boilers — setback and operational requirements

Cite as Solid Fuel Burning Domestic Appliance Regulation, B.C. Reg. 218/2016, s. 7 · last amended March 30, 2022 · read from BC Laws on November 17, 2026

The text

(1) In this section, "installed" means installed outdoors or in a structure not ordinarily used as living space. (2) An owner of a parcel must ensure that a boiler that is installed on the parcel after November 1, 2016 but before May 1, 2017 is installed as follows: (a) if the boiler is a certified boiler or a phase 2 qualified boiler, not less than 40 m from each of the parcel's boundaries; (b) in any other case, not less than 80 m from each of the parcel's boundaries. (3) An owner of a parcel must ensure that a boiler that is installed on the parcel on or after May 1, 2017 is (a) a certified boiler, and (b) installed not less than 40 m from each of the parcel's boundaries. (4) Despite subsections (2) (a) and (3), if the certified boiler is designed to burn only pelletized fuel, the boiler must be installed not less than 10 m from each of the parcel's boundaries. (5) A person must not operate a boiler installed contrary to subsection (2) (a) or (b), (3) or (4). (6) On and after November 1, 2026, a person must not operate an installed boiler unless the boiler is a certified boiler or a phase 2 qualified boiler.
Read the Solid Fuel Burning Domestic Appliance Regulation on BC Laws ↗

Made under Environmental Management Act, SBC 2003, c. 53.